Loading...
HomeMy WebLinkAboutBLD-18-7110 RECEIVE0 OCT 01 20Ig 1 BUILDING OEPARTM,..JT BY MICHELE CUDILO, P.E. Consulting Structural Engineer 123 Cottonwood Ln.,Centerville,Massachusetts 02632-1979•(508)737-8521 •mcudilo@comcast.net • • October 1,2018 Town of Yarmouth Building Dept. 1146 Route 28 So.Yarmouth,MA 02664 Attention:JAMES BRANDOLINI,Tim Sears Building Inspectors RE: ADDITION AT 117 Breery Point,So.Yarmouth,MA Dear Mr.Brandolini and Mr.Sears, Please be advised that the above captioned project has been inspected this date,and has reviewed the wall sheathing nailing for the new 1-story addition,as follows: . 1. One-story wall sheathing nailing 8d @3"o/c edge and 12"o/c field. These sheathing nailing patterns are acceptable for the wind load on the 1-story floor walls with minimal openings. I trust that the above addresses your needs at the present time. Should you have any question on any of the above,please • do not hesitate to call. Sincerely, �4, 0;On% waft . MICHELE os 7.4,, Michele Cudilo,P.E. cV� SNo 34774 A • /2018130 %/sl a Q. cc: J.Dunne Gvatea RI 6 - 1 - 007110