Loading...
HomeMy WebLinkAboutEngineered Plan - 2018TOP OF FOUNDATION ELEVATION 99.60 ROUTE 6 WHITES PATH SITE BEACON 5� 9s��- S�. 9L� LOCUS SCALE 1 "=1500' N/F PATRICK H SILVESTRO CIO WAYNE L EARNES 143 ASTOR WAY MAP/LOT EXISTING LEACH PIT TO REMAIN EXISTING DISTRIBUTION f BOX TO BE REMOVED PROPOSED 9.89' X 18' ADDITION TO MASTER BEDROOM (BATHROOM AND WALK-IN CLOSET) (SLAB FOUNDATION) OF 6' CRUSHED STONE PROPOSED SEPTIC TANK (H10) EXISTING TANK TO BE REMOVED T PROP.OSED.NEW 1,500 GALLON .SEPTIC TANK 99. PROPOSED > DISTRIBUTION BOX S2.95 W c 5 -142 0 CA l w .71 X 98.35 -10 .0, Z' J N/F JUDITH S DEAL 22 MONOMOY ROAD MAP/LOT 99115 0 RISERS TO BE INSTALLED TO BRING COVERS TO WITHIN 6" OF GRADE RISER ON D-BOX TO BE BROUGHT TO GRADE WITH CAST IRON FRAME AND COVER SYSTEM PROFILE NOT TO SCALE ZONING REQUIREMENTS ZONING DISTRICT: R-40 REQUIRED EXISTIN PROPOSED MINIMUM FRONT YARD SETBACK 30' 33.3't 33.3't MINIMUM SIDE YARD SETBACK 20' 36.6't 30.8't MINIMUM REAR YARD SETBACK 20' 27.7't 27.7't MAXIMUM PERCENT TOTAL LOT COVERAGE 25% 10.47.t 11.6%± EXISTING FENCE U+ 0 O � rn 98.47 X r. 2d RE SEIB � o -o 98.85 p Q_ io -o .._' 18" SPRUCE EXISTING 1000 GALLON LEACH PIT TO REMAIN PROPOSED ADDITION - MASTER BATH AND WALK-IN CLOSET (SEE ARCHITECHURAL DRAWINGS) X 98.71 BENCHMARK LIVING RM GARAGE MAC NAIL SET ELEVATION = 98.30' (ASSUMED) \ 9G i "J 24" TULIP \� o �,y��' X 99.08 EXISTING GAS 1 METER jo \ 97.62 i 97.52 �f `\, n LOT 299 � `\ o �, \ 14,999 SQ. FZ. t \ ° I \ 0.34 ACRES \± Xg7 \ \\481.35 PERIMETER ` X 98.80 \ \ EXISTING ELECTRIC 96.71 METER \12",f'lNE (TYP.} W\III/ A=58.30 \\ R=30.00' >' /Ill\ D=1 1'20'55> 96.53 0 93�3'96.78 .52 5 7 4 22, 56„ W riID � g0 >('97 04 SUN ROOM KITCHEN I MASTER BEDROOM I PORCH I BATH I BEDROOM FLOOR PLAN NOT TO SCALE p,52659 � 0 kis-rE IONAL LEGEND o� PROPERTY LINE ------------104--------------- EXISTING CONTOUR - - -104 - - - d PROPOSED CONTOUR EXISTING FENCE :T X-T- vHP EXISTING OVERHEAD UTILITIES W- EXISTING WATER LINE PROPOSED WATER LINE W G PROPOSED NATURAL GAS LINE --UGE PROPOSED UNDERGROUND POWER/TELCOM rim TP-1 LOCATION OF TEST PIT/PERC TEST 99.76 X EXISTING SPOT ELEVATION QFH EXISTING FIRE HYDRANT UP -0- EXISTING UTILITY POLE SH BULKHEAD 0�� PROPSED SPOT GRADE SITE INFORMATION ADDRESS: 137 ASTOR WAY SOUTH YARMOUTH MA 02664 MAP/LOT: 99/ 16 DEED REFERENCE: DOCUMENT 1286585 DESIGN CALCULCATIONS DESIGN FLOW 110 GALLONS/DAY/BEDROOM X 3 BEDROOMS = 330 GALLONS/DAY 200% DAILY FLOW = 660 GALLONS; USE NEW 1,500 GALLON TANK REQUIRED LEACHING CAPACITY USE EXISTING LEACHING FIELD GENERAL NOTES: 1. NONE OF THE SUBJECT PROPERTY IS WITHIN THE LIMITS OF A FEMA FLOOD HAZARD ZONE AS SHOWN ON PANEL NO. 25001 CO587J, EFFECTIVE DATE JULY 16, 2014. 2. THE SITE IS LOCATED WITHIN A ZONE II AREA. 3. THERE ARE NO STREAMS OR WETLANDS WITHIN 100-FEET OF THE PROPOSED SUBSURFACE SEWAGE DISPOSAL SYSTEM. 4. VERTICAL DATUM IS ASSUMED 5. ALL CONSTRUCTION MEANS AND METHODS SHALL CONFORM TO 310 CMR 15.00 STATE REGULATIONS AND LOCAL BOARD OF HEALTH AND BUILDING DEPARTMENT REGULATIONS. 6. ALL JOINTS IN THE TANK AND DISTRIBUTION BOX SHALL BE MADE WATERTIGHT THROUGH THE USE OF ASPHALT OR SYNTHETIC POLYMER SEALERS OR HYDRAULIC CEMENT. 7. DIGSAFE AND LOCAL UTILITY COMPANIES SHALL BE CONTACTED PRIOR TO ANY EXCAVATION OCCURRING. 8. LOCATION OF UTILITIES ON THIS PLAN ARE APPROXIMATE AND SHALL BE . VERIFIED IN THE FIELD. -9.- --THE SEPTIC SYSTEM INSTALLER _SHALL NOTIFY THE._DESIGN_ENGINEER_2__ DAYS PRIOR TO BEGINNING INSTALLATION OF THE SYSTEM TO ALLOW FOR SCHEDULING OF INSPECTIONS 10. THE INSTALLER SHALL VERIFY EXISTING BUILDING SEWER AND LEACH PIT INLET INVERT ELEVATIONS PRIOR TO THE PLACEMENT OF ANY STRUCTURES. 11. THIS DESIGN DOES NOT ALLOW FOR THE USE OF A GARBAGE GRINDER Yarmouth Health Depzutment ED lame Date 4 CRESTVIEW DRIVE EAST SANDWICH, MA 02537 PHONE: (508) 400-2365 SITE DESIGN, LLC Residential Site Design and Permitting LOG770,91- 137 ASTOR WAY SOUTH YARMOUTH, MA 02660 cu N DAVID AND SUSAN KITCHEN 42 SUMMER STREET NORWELL, MA 02061 . DRAW/NO nRE SUBSURFACE SEWAGE DISPOSAL SITE PLAN AND PROFILE SG4L£. a0r DRAW/NC NQ 1 "=20 7/16/2018 -]_ DF