Loading...
HomeMy WebLinkAboutApp-Permit-ComplianceNo. �O ►7�C-llj�O�/� 1� f 5 COMMONWEALTH OF MASSACHUSETTS Board of Health, V P a M , MA. FEE' APPLICATION FOP DISPOSAL SYSTEM CONSTRUCTION PERMIT Application for a Permit to Construct( ) Repair( ) Upgrade Bandon( ) - ❑ Complete System VIudividual Components Location '3r p/y �( Owner's Name Map/Parcel# 22 3 C ! Z Address Gn O ro -P,�J !a. Lot# Telephone# Installer's Name G ; d- ,�' L� Designer's Name Address j Co .-ti..•,G L; ✓� 1 �✓'( Address Telephone# y 'j $ —j ') Telephone# Type of Building Lot Size sq. ft. Dwelling - No. of Bedrooms Garbage grinder( ) Other - Type of Building No. of persons Showers ( ), Cafeteria ( ) nrher Fixnn•es Design Flow (min. required) gpd Calculated design flow Design flow provided gpd Plan: Date Number of sheets Revision Date Title '.Description of Soil.(S) Soil Evaluator Form No. Name of.Soil Evaluator Date of Evaluation DESCRIPTION OF REPAIRS OR ALTERATIONS "��t0-� . �Z-� " _-ap z The undersigned agrees to install the above described Individual SewageDisposal System in accordance with the provisions of TITLE 5 and further agrees to not to place the system in operation until a Certificate of Compliance has been issued by the Board of Health. Signed �� C �- Date Inspections No. o C—Ie--- 0 2_ 7 �°` �� FEE :.- COMMONWEALTH I.TH Of MASSACHUSETTS Board of Health, MA. CERTIFICATE Of COMPLIANCE Description of Work: individual Component(s) O Complete System The undersigned hereby certify that the Sewage Disposal System; Constructed O, Repaired ;(A, Upgraded ( ), Abandoned ( ) athas been installed in accordance with the provisions of 31.0 CMR 15.00 (Title 5) and the approved design plans/as-built plans relating to application No. '=%.� • datedl .�!*% Approved Design Flow (gpd) Installer- c k = J C-e``A Designer: --- - Inspector: 1..1C Date: /,(l The issuance of this permit shall not be construed as a guarantee that the lystim will function as designed. No. 1(30 v`13,, �lJr2— 7 l ti COMMONWEALTH Of MASSACHUSETTS Board of Health, �/ ,fit r� qv�A-- , Am. FEE ^� X C�...- 13 DISPOSAL SYSTEM CONSTRUCTION PERMIT Permission is.hereby granted to; Construct( ) Repair(j Upgrade ( ) Abandon ( ) an individual, sewage disposal system at Di as described in. the application for Provided: Construction shall be complexed within three years of the date of this p ri ' All local,fo tions must be met. Form 1255 Rev. 6/96 A.M. Sulkin Co. Chadesiown, MA Date / '-/ Qoard of Health.