Loading...
HomeMy WebLinkAboutBLD-19-2388 %Ven ECTER s OR RECEIVED Project Number: U2041-1873-182 DEC 04 2018 November 26,2018 BUILDING DEPARTMENT Trinity Solar By: —. _ 20 Patterson Brook Road,Unit 41 W.Wareham,MA 02576 ATTENTION: Ashley Grey REFERENCE: Kimberly Chagnon-Post Install Residence:81 Captain Nickerson Road,Yarmouth,MA 02664 Solar Panel Post Installation Letter Dear Ms.Grey: Per your request,we have reviewed photographs and a post-installation checklist for the above-referenced site. Based upon our review, it is our conclusion that the installation of solar panels on this existing roof occurred in accordance with the building code and our original requirements as stated in a letter dated October 8, 2018. Rafter size and spacing has been verified to match the original design. Water damage was not encountered during work on and under the existing roof. No pre-installation splits,cuts,breaks,or visible sagging was encountered in the existing roof framing. After installation was complete, it was verified that all roof-penetrating fasteners actually penetrated into the roof framing and did not visibly split the framing members. No existing damage to any existing structure was discovered and no damage was caused to any existing structure during installation, according to the installer. All roof penetrations were sealed and flashed as a means of waterproofing. Our conclusions are based upon our review of the photos and a checklist prepared by the installer. This letter does not waive the installer of any responsibility for improper installation. As stated in a previous letter, our conclusion regarding the adequacy of the existing roof is based on the assumption that all structural roof components and other supporting elements are in good condition. We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your convenience. Very truly yours, VECTOR STRUCTURAL ENGINEERING,LLC ElForedaiy Aped QERT. Roger':C N Alworth=11.29 i1`/lt, N 10:11:0.9-0r00' 47740 se wesNAL'#G Roger T.Alworth,P.E. 11/2 6/2018 MA License:47740—Expires:06/30/2020 Principal RTA/rsl 651 W. Galena Park Blvd., Ste. 101 /Draper, UT 84020/T (801)990-1775/F (801) 990-1776/ www.vectorse.com )VECTOR REcome D 201 E n O I n E E R 3 ^ p`3 gPARSMEN1 Project Number: U2041-1873-182 BuIt-0% G=�— November 26,2018 ew Trinity Solar 20 Patterson Brook Road,Unit#1 W.Wareham,MA 02576 ATTENTION: Ashley Grey REFERENCE: Kimberly Chagnon-Post Install Residence:81 Captain Nickerson Road,Yarmouth,MA 02664 Solar Panel Post Installation Letter Dear Ms.Grey: Per your request,we have reviewed photographs and a post-installation checklist for the above-referenced site. Based upon our review, it is our conclusion that the installation of solar panels on this existing roof occurred in accordance with the building code and our original requirements as stated in a letter dated October 8, 2018. Rafter size and spacing has been verified to match the original design. Water damage was not encountered during work on and under the existing roof. No pre-installation splits,cuts,breaks,or visible sagging was encountered in the existing roof framing. After installation was complete, it was verified that all roof-penetrating fasteners actually penetrated into the roof framing and did not visibly split the framing members. No existing damage to any existing structure was discovered and no damage was caused to any existing structure during installation, according to the installer. All roof penetrations were sealed and flashed as a means of waterproofing. Our conclusions are based upon our review of the photos and a checklist prepared by the installer. This letter does not waive the installer of any responsibility for improper installation. As stated in a previous letter, our conclusion regarding the adequacy of the existing roof is based on the assumption that all structural roof components and other supporting elements are in good condition. We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your convenience. Very truly yours, VECTOR STRUCTURAL ENGINEERING,LLC �{N o� �nYae„�a nooenft Roger aan° ALWOATM Alworth CIVIL to 10.11:osoroa No.47140 1g P' S/ONAL O Roger T.Alworth,P.E. 11/26/2018 MA License:47740—Expires:06/30/2020 Principal RTA/rsl 651 W. Galena Park Blvd., Ste. 101 /Draper, UT 84020/T (801)990-1775/F(801)990-1776/ www.vectorse.com • OC.Y4R TOWN OF YARMOUTH Building Department Y.) BUILDING • 4 (508)398-2231 ext.1261 ( E: , (k` \`6 PERMIT ( PERMIT NO !BLD-19-002388 Q� �,:: . JOB WEATHER CARD \rte "cd ISSUE DATE ;10/23/2018 • •Car APPLICANT 1Trinity Heating and Air DBA Trin PERMIT TO Repair AT(LOCATION) 181 CAPT NICKERSON RD,SOUTH YARMOUTH,M I ZONING DISTRICT I I Bldg.Type: !Residential SUBDIVISION MAP BLOCK LOT 088.275 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Install 13.23kw solar panels on roof.Will not exceed roof panel,but will add 6" CONTRACTOR to roof height.42 total panels. LICENSE MA Construction Supervisor Trinity Heating and Air DBA Trinity Solar AREA(SQ FT) 1796,930,200.1 EST COST($) 144000.00 I PERMIT FEE($) 150.00 Paul Eaton 20 Patterson Brook Rd Unit 1 OWNER CHAGNON KIMBERLY E W.Wareham,MA 02576 BUILDING DEPT BY ADDRESS j,81 CAPT NICKERSON RD SOUTH YARMOUTH ,MA 02664 _ 4 _ PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET LLEY OR SIDEWAL ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, Not SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS . o OTHER: WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARf1VF ( rinity SOLAR October 22, 2018 To: Building Dept. From:Tristan Souza—Trinity Solar(508) 291-0007 ext. 1231 Subject: Permit Application for a solar installation Enclosed please find an application and checks for 81 Captain Nickerson Rd. building and electric permits. If you have any questions, please contact me at 508-291-0007 ext.1231. Thank You, Tristan Souza Trinity Solar 20 Patterson Brook Rd. Unit 1 W. Wareham, Ma 02576 Tristan.Souza©trinitysolarsystems.com