Loading...
HomeMy WebLinkAboutSite Plan Review 10-16-2018 • •._t Formal Informal__X Review SITE PLAN REVIEW COMMENT SHEET Date: October 16, 2018 New Map: 55 New: Lot: 26 Applicant:Town of Yarmouth-YPD Location: 340 Higgins Crowell Rd.,West Yarmouth, MA 02673 Zone: R-40/APD Persons Present: Kathy Williams O. Bruce Wilson Nick Aguiar A)F} Deputy Chief Steven Xiarhos Mark Grylls G. Bruce Murphy (h W( ff Project Summary Applicant proposes to construct a K9/Police Officer Training Facility. Comments Building: Existing use in its current form is allowed by the granting of a Special Permit. Decision#3594 granted March 9, 2000.A modification of the existing SP or a new SP will be required to modify the existing use. Buffers in area of modification are adequate, however in order to meet the requirement of section 301.4.6 for in lot trees, two more tree will need to be added in the new parking area or seek relief from this section.Any proposed outdoor lighting will be required to meet the requirements of section 301.4.10. Snow storage should be indicated on the site plan in accordance with 301.10. Building is essentially a utility structure. Plan shows a shell and no indication of any type of lighting or power source. If power/lighting is proposed, exit signage and emergency lighting should also be considered. It is understood that this building will not be occupied by the public. Additional windows should also be considered. In accordance with 780 CMR natural lighting(8% of floor area being served)as well as ventilation(4%of floor area)are a requirement in sections 1203.5.1 & 1205.2 of the IBC.This will be a more realistic training environment as all habitable spaces in the Commonwealth are required to meet these standards. 780 CMR does allow these standards to be met via exceptions through artificial means. I have contacted Marc LaPointe, State Building Inspector regarding the open risers on the stairs and have been granted the authority to waive the building code requirement of being solid risers. Further code items will be reviewed as they arise. All other applicable sections of 780 CMR will be reviewed at time of application. APD waiver should be investigated regarding the firing range. Planning: • Buffers: Retain existing trees 4" in diameter and greater in the buffer areas. Supplement as needed with 3" caliper trees to create a buffer with trees a minimum of every 20'to screen parking. • In-lot Parking Trees: Add two more tree within the new parking area to provide a minimum of 1 tree/8 new parking spaces. Consider adding in-lot trees in the remainder of the parking areas. • Photometrics for the site lighting needs to conform to Section 301.4.10 with regard to maximum foot candles at the property line. Site lighting to have a maximum 20' height. Conservation: Not present. Design Review: Project does not require Design Review. Engineering: Snow storage for the site needs to be included within the layout plan. Consider adding additional means of ingress to/egress from training site. Verify that proposed 12' wide gated access and adjacent training site driveway provide adequate accessibility and maneuverability for emergency vehicles. All new utility services are to be placed underground with proposed layouts shown on design plans submitted for formal review. Since the subject parcel is located within the Aquifer Protection District (APD) the applicable guidance and standards set forth in the Mass. Stormwater Handbook are to be utilized. It is recommended that the proposed paved * •. • w?terway be removed and replaced with a localized highpoint (=EL.40.1') that diverts runoff to both existing and proposed BMPs for pretreatment prior to discharge. It is also recommended that a deep sump manhole be utilized. in conjunction with both the primary and overflow drains to achieve prescribed 44% TSS removal prior to discharge to infiltration. Include edge treatments along parking area and driveway adjacent to existing retention basin. Include the following information with the submission required for formal site plan review: • Site layout plan showing snow storage accommodations. • Layout of all proposed utility connections. • Complete package of engineering design calculations used to size the proposed on-site stormwater management system and verifying that the existing and proposed infrastructure can accommodate the new post-development peak discharge rate. Are: Not present, coordinate with Fire Department. Health: Locate existing septic leaching system and show on site plan; septic system not designed to vehicle traffic;show K9 kennel and area; living round training structure-submit ventilation spec;for building dept. review, recommend sticky mat at entrance of range. Water: Consult with Water Department to determine appropriate location and appurtenances for water utilities for fire fighting purposes. ead &Received by Applicant(s) („44(