Loading...
HomeMy WebLinkAboutEngineered Plan - 2018 - 6 BR Design with Garbage DisposalSYSTEM DESIGN: LEGEND X 99 EXIST. SPOT ELEV. —[99]— PROPOSED CONTOUR [98•41 PROPOSED SPOT EL. TH1 rh TEST HOLE SLOPE OF GROUND UTILITY POLE FIRE HYDRANT NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRAWING *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM **INSTALLER SHALL CONFIRM MINIMUM SEPTIC TANK SIZE AT 1000 GALLONS AND ITS SUITABILITY FOR RE —USE. REPLACE WITH 1500 GALLON SEPTIC TANK APPROPRIATE TO SITE CONDITIONS IF NOT SUITABLE DCE # 18-087 GARBAGE DISPOSER IS PROPOSED DESIGN FLOW: 6 BEDROOMS @ 110 GPD = 660 GPD 660 GPD X 1.5 = 990 USE A 990 GPD DESIGN FLOW I SEPTIC TANK: 990 GPD (2) = 1980 **USE EXISTING 1000 GAL SEPTIC TANK ADD 2500 GAL DUAL COMPARTMENT SEPTIC TANK/PUMP CHAMBER LEACHING: i 990 GPD / (.74) = 1338 SF REQUIRED 30' X 45' = 1350 SF OK 1350 SF X .74 = 999 GPD OK USE A 30' X 45' PIPE AND STONE LEACHING FIELD { MA APPROVED DATE BOARD OF HEALTH BENCHMARK: MAGNETIC NAIL SET=5.1' NAVD88 { SYSTEM PROFILE (NOT TO SCALE) MARK CORNERS OF LEACHING FIELD W/ { REBAR SET 4" BELOW PROVIDE INSPECTION PORTS TO PROVIDE MIN. 20" DIAM. WATERTIGHT GRADE WITHIN 3" OF FINISH GRADE \ TOP FOUND. EL. 6.9' ACCESS COVERS TO WITHIN 6 OF FIN. GRADE 2% SLOPE FILTER FABRIC I TOP 7.62' FINISHED GRADE- 4" LOAM & SEED MINIMUM .75' OF COVER OVER PRECAST 2% SLOPE REQUIRED OVER SYSTEM 8.4 PRECAST H-10 NOTE: 2" MIN. WALL 14111 11 111 V, RISERS (TYP.) PRECAST H-10 THICKNESS REQUIRED CLEAN FILL `••' 2'� RISERS (TYP.) 2'0 PROP. TE*4 H40 PVC LEVEL 1ST 2' 4' PERFORATED PVC 5' O.C. $=0.005 J]77.0' PROPOSED 5.0't BARN ,.. ,0» y " CONNECTION TEE S EXISTING TEE * l 1D" k 9" STONE LEACHING FIELD ELOW INV. 2500 GAL H-20 3 4"-1-1 2 DOUBLE WASHED DEPTH MIN SEPTIC TANK 5.7 SEPTIC TANK/ GAS BAFFLE 3.54 TEE PUMP CHAMBER 7.25' LEVEL BOTTOM COMBINATION On SEE DETAIL BELOW 0o 0°00°°00o0o°o°o°o000o0000°0000000000000000000 WATER -TEST D'BOX FOR LEVELNESS ° ° o ° ° ° ° ° O o ° o ° o ° O O o ° ° O o ',�O,,O,O-(+..n„n. 0 0 0 0 ('10 C.t•_n_°-n.0 0 O' 5.0' -- 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [2]) 1.5' ASSUMED GROUNDWATER ELEVATION ( 27 % SLOPE) (1 % SLOPE) SEPTIC TANK1/ LOW PROFILE FOUNDATION EXIST. SEPTIC TANK 8' PUMP CHAME3ER 31 D' BOX 12' BARN 73'� ( 2 % SLOPE) LEACHING FACILITY 16.0-7.0' o� c P ° o ° co 9e o e OlnPs Q ° o�� o� Levris Pond Lewis Bay co`P odio Power d 0 Locus Nantucket Glut Sound LOCUS MAP SCALE 1 "=2000'f ASSESSORS MAP 14 PARCEL 11 LOCUS IS WITHIN FEMA FLOOD ZONE AE (100 YEAR FLOOD HAZARD AREA — EL. 11) AS SHOWN ON COMMUNITY PANEL #25001CO588J DATED 7/16/2014 ZONING SUMMARY ZONING DISTRICT: R-25 RESIDENTIAL DISTRICT MIN. LOT SIZE 25,000 S.F. MIN. LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 15' MIN. REAR SETBACK 2o, 2% MIN. SLOPE OVER SYSTEM NOTES MAX. BUILDING COVERAGE 25% 4" LOAM &SEED W30" f i CAP STONE UNITS 1. DATUM IS NAVD 88 1/2" x 5 1/4" 2. MUNICIPAL WATER IS EXISTING fii=_tom _ 9" COVER Tl �� !--II-� Fiberglass / TEST HOLE LOGS i I-L-_ , Pins 3. MINIMUM PIPE PITCH TO BE 1 8" PER FOOT. 11HI1- 11-1 'MIN. 30" MAX 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS AS 5 i 6" vARIEs TO BE AASHO H-10 ENGINEER: CRAIG J. FERRARI, SE # 13871 PEASTONE 5. PIPE JOINTS TO BE MADE WATERTIGHT. AMY VON HONE, IRS SAND BACKFILL AGAINST WITNESS: WALL 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 4 2018 40 MIL LINER FROM TOP PEASTONE/WALL '� • ' 310 CMR 15.000 (TITLE 5.) DATE: 4 / / TO 12" BELOW GRADE PERC. RATE _ < 2 MIN/INCH 1 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO KEYSTONE OR EQUAL RETAINING WALL UNITS BE USED FOR LOT LINE STAKING OR ANY OTHER 18"X8" SET WITH 1" BATTER PER ROW PURPOSE. CLASS I SOILS FIBERGLASS PINS REQ. 6"X30" Crushed Rock or Unreinforced Concrete 8. PIPE FOR STTIC SYSTEM TO SCH. 40-4" PVC. ELEV. ELEV. Leveling Pad req. 9. COMPONENTS,, NOT TO BE BACKFILLED OR CONCEALED „ „ ' WITHOUT ON BYAND RETAINING VA L L - V R 0iJ S ',� � E C TI O N ERMISSIONSPEOBTAIN D F RBUMABO � D OFALTH HEALTH NOT TO SCALE 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE FILL FILL LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES 45" 45" PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE A A REMOVED BENEATH AND 5' AROUND THE PROPOSED LS LS LEACHING FACILITY. 1 OYR 2/ 1 �� 10YR 2/ 1 , 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND 48" 3' 48 3 REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. C PERC C M/FS M/FS G—W J WELL:I 1OYR 7/4 ZONE: ADJ: MARC 120" _3' NCOUNTERED AT EL. 0.0 I TF PLAN i ACCESS FOR ROUTINE . MAINTENANCE 24" 4 CAST IRON MUST BE. PROVIDED FOR ZABEL FILTER. COVERS TO GRADE INSTALLER MUST FOLLOW ALL :I MANUFACTURER'S SPECIFICATIONS FOR PROVIDE QUICK DISCONNECT FOR PUN PROPER FILTER INSTALLATION I ALARM AND CONTROL PANEL --------------------------- TO BE INSTALLED INSIDE - BUILDING. ALARM TO BE ON INV. IN 5.5' 'i SEPARATE CIRCUIT FROM PUMP ZABEL FILTER � FLOAT SWITCH ALARM ON (A100) 19" TEE OUTLET TEE W/EXTENSION SETTINGS: PUMP ON 6" MIN. 1500 GAL. 5" WORKING RANGE THIS SIDE 5" OF BAFFLE PUMP OFF 12" I o00 00000 00 0 000000 000�-> 00 0000 2500 GAL. SEPTIC TANK/ 6" BAFFLE PUMP CHAMBER COMBINATION (NOT TO SCALE) NO LOW POINTS 2" PRESSURE LINE •-'!= SLOPE TO DRAIN BACK -0.25" WEEP HOLES CHECK VALVE MYERS SRM 4 SUBMERSIBLE 4/10 HP PUMP SYSTEM (OR EQUAL) P - — Ya1,rmoutYi Het tlih Depalrtment a1Y1 iz ae —.-.-._._._ ._ Amv •(F1 OF 4f, �o DANIEL A. /o OJALA o� DAN I' o� NoC.46502 OJ �o <� A No. 4 �SSrONAL ENS I �9opFS SU DATE DANIEL A. OJALA, P.E., P.L.S i .a CHANNEL POINTDRIVF WEST YARMOUTH, MA PREPARED FOR RAJ JAYASHAIN"N"AR DATE: APRIL 25, 2018 RECEIVED Scale:1 "= 20' J U N 2_0 2018 HEALTH KEPT �^ 0 10 20 30 40 50 FEET F-M sq ' •.� 'IIEL n�� off 508-362-4541 AI..A v fax 508-362-9880 i 0980 v ! , downcope.com S\°yo� aOW cope efPriaeeflh f, inc. ROE. civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOUTHPORT MA 02575 18-087 JAYASHANKAR.DWG