Loading...
HomeMy WebLinkAboutEngineered Plan - 2018la n4 LOCUS O 0 PAR 3 DF LOCATION MAP LOT 12 (10,894 SF) ASSESSORS MAP:90 PARCEL:88 PLAN BOOK: 199, PAGE: 11 M 18-43 KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: V575 TEST HOLE: * UTILITY POLE: FENCE LINE: - HYDRANT:.-6- RETAINING WALL: L EXISTING CESS POOL TO BE LOCATED, PUMPED AND FILLED WITH SAND. (LOCATION AS SHOWN IS NOT ACCURATE) 25.0' bo CV LEACH AREA DETAIL PROPOSED PLUMBING CHANGE TO BE VERIFIED PRIOR TO CONSTRUCTION, SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 2 BEDROOMS AT 110 GAL / DAY = 220 GAL / DAY SEPTIC TANK: 220 GAL / DAY x 2 DAYS = 440 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: (3 BEDROOM DESIGN, MINIMUM) USE 2 - 500 GALLON CHAMBERS (8.5' x 4.8' x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (25' x 12.8' x 2' DEEP) SIDE AREA: (25' + 12.8') x 2 x 2 = 151 SF (0.74) = 112 GAUDAY BOTTOM AREA: 25' x 12.8' = 320 SF (0.74) = 237 GAL/DAY CAPACITY = 349 GAL/DAY SEPTIC SYSTEM SECTION FIRST FLOOR COV 101.7 OF F TOP OF a^ FOUNDATION '- 98.7 1 /4" per ft. ELEV. A I� 98.5 \ ELEV. 1500 GAL SEPTIC TANK 6" OF STONE UNDER OR PROPOSED PLUMBING ECHANICALLY COMPACTED) CHANGE TO BE VERIFIED TEE SIZES: PRIOR TO CONSTRUCTION. INLET: 6" UP, 13" DOWN EXISTING ELEVATIONS = 99.2 OUTLET: 6" UP, 14" DOWN LIVING ROOM m DINING ROOM GARAGE EXISTING FLOOR PLAN Yarmouth Health VDeppjg�iment tpp-k-1 �n1ok, _A�..- - Date 2" PEASTONE OR FILTER FABRIC GRADE 6" 3/4" - 1 1/2" DOUBLE GWASHED STONE FINISHED GRADE /-INSPECTION PORT �-ELEV.= 98.18 (1 MAX. 1/8"per ft COVER (1' MIN) �.25 1/8" per ft .EV. 97 65 9 A8 ELEV. D-BOX ELEV. 6" OF STONE UNDER OR MECHANICALLY COMPACTED) / ELEV. - GAS BAFFLE AT OUTLET TEE TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 8-2-18 PERCOLATION RATE: < 2 MIN/IN NOTES: 11 ° ° 1.11 95.35 4 4 ELEV. rz 25' x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25' x 12.8' x 2' DEEP) TH-1 100.7 O/A HORIZON ELEV. LOAMY SAND 10YR 3/1 , B HORIZON LOAMY SAND 30" 10YR 5/8 gg C HORIZON MEDIUM SAND 2.5Y 7/4 132" NO GROUND WATER ENCOUNTERED 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D-BOX TO BE SET LEVEL, 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. -- BENCHMARK AT 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 101 LEFT CORNER S BOTTOM BRICK STEP 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' WITHOUT VARIANCE. \ ELEVATION = 102.01 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. \ 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND \ IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE \ PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY !. CB \ REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING CESS POOL AND LEACH PIT ARE TO BE PUMPED AND FILLED WITH SAND OR REMOVED. N 14. D-BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. ,d T ww orll 118 15. A 2 BEDROOM DEED RESTRICTION IS TO BE RECORDED AT THE REGISTRY OF DEEDS PRIOR m\r \o o= TO CONSTRUCTION. HEALTH DEPT. I-- '--100.4 I 0�/&// � SITE PLAN LOCATION: 101 CHIPPING GREEN CIR., S. YARMOUTH, MA PREPARED FOR: DENNIS BRISSON DATE: 8-3-18 SCALE: 1" = 20' BASS RIVER ENGINEERING THOMAS J. McLELLAN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048