HomeMy WebLinkAboutBLD-19-002459 of•YgR TOWN OF YARMOUTH Building Department u��q, BUILDING
- MB) 398.2231 ext.1261 j��\
0 ..d y PERMIT NO :BLD-19-002459 Q,` \0\lb° PERMIT
?eu;'�;mss' ISSUE DATE ;10129/2018 JOB WEATHER CARD
APPLICANT ;Daniel Bairos PERMIT TO I Repair
IAT(LOCATION) 111 THISTLE CIR UNIT 34A,YARMOUTH PORT,MA I ZONING DISTRICT I I Bldg.Type: 'Residential
SUBDIVISION MAP BLOCK LOT 108.61C34A BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Repair.Demo of existing shower CONTRACTOR
LICENSE 060703
Construction Supervisor
1Emond Brothers
Daniel Bairos
153 Broadway
AREA(SQ FT) 0.00 EST COST($) 2350.00 PERMIT FEE($) x90.00 Raynham,MA 02767
OWNER CLEMENS JOAN S TR BUILDING DEPT BY `
ADDRESS J C REALTY TRUST,10 EAGLE DR
SHARON MA 02067-2908Gfd4f 1't, PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEW OR NY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION 'AROVF