Loading...
HomeMy WebLinkAbout2018 Sep 13 - Sign Off Transmittal, Plan - PoolTEST HOLE LOG DATE: SOIL EVALUATOR: •�•-� So cs� WITNESS: - `/v L�.p PERC RATE: "o��jrrs�iC ,�An.LO -sy%y 2 a 0 A . GoAMy i• iV 3'AnJ ao �yN� �� y /O le / Q ✓' C ,Z%je 5, Aj o L 0s,, 2/Y 11116 /Vo �t/ATE�2 �iJGov��cse.�.a. DESIGN DATA DAILY FLOW: (+) BDRMS. z 110 GPD =4+0 GPD SEPTIC TANK. + f o GPD z 200% = 08-- GPD \ USE: /so o GALLON PRECAST SEPTIC TANK LEACHING FACILITY: USE: Q 3' 5" �S.%.. mac; o ,p. ,1,, 'CS wl y� o s�-JG /�E3�7 z NOTES: _ 1. ALL PIPE TO BE 4" DIA. SCH 40 PVC. 2. PIPE TO BE LAID LEVEL FOR 2' OUT OF DISTRIBUTION BOX. 3. RAISE ALL APPLICABLE MANHOLE COVERS TO WITHIN 6" OF FINISH GRADE. 4. SEPTIC SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 5. SEPTIC TANK AND DISTRIBUTION BOX TO BE INSTALLED ON A 6" LAYER OF STONE. 6. INSTALL GAS BAFFLE IN OUTLET TEL TOP OF FOUND. @q EL. Z5, co/ fo• 14 zz,Q z/Y 2.1 SEPTIC SYSTEM PROFILE SITE - SEWAGE PLAN FOR PREPARED FOR F� U SCALE: AcL14 151 1558 SIDEWALL: -73 x" o•7f` I3'% 69 BOTTOM:..13 �33sx o,7�--32Z TOTAL: 2" LAYER OP 318" PEASTONE OVER 314• -1 1/2" WASHED STON%ALL AROUND I, � WORK MUST F TOWN. BYL & GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE AND UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 1& 00: TITLE V. 3. THIS PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. ALL DISTURBED AREAS TO LOAMED AND SEEDED S. CONTRACTOR TO PROVIDE 24 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS Nn(�aI:...0...V1, h�D AUG 17 1998 HEALTH DEPT war z .