Loading...
HomeMy WebLinkAboutBLD-19-2481 '"cif*Yet 0 TOWN OF YARMOUTH Building Departmentb, BUILDING _�' , �r0 (508)398-2231 ext.1261 . \.I p " - t y PERMIT NO !BLD-19.002481 ' \C� \ PERMIT � ;rs� ISSUE DATE ;11105/2018 �� JOB WEATHER CARD APPLICANT ;Jean K Bowden PERMIT TO ' Repair AT(LOCATION) 130 BROOKHILL LN,WEST YARMOUTH,MA 02673 I ZONING DISTRICT ( 1 Bldg.Type: 'Residential 1 SUBDIVISION MAP BLOCK LOT 1031.15 1 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS REPAIR:REMOVE OLD BULKHEAD AND REPLACE WITH NEW TYPE C CONTRACTOR BULKHEAD SAME SIZE AS EXISTING.ALSO REPLACE 1 EXTERIOR LICENSE 064817 ENTRY DOOR INSIDE THE BULKHEAD AREA TO BASEMENT WITH NEW Construction Supervisor FIBERGLASS FLAT STOCK STYLE CAPIZZI HOME IMPROVEMENT, INC 379,494,720. EST COST($) 5000 00 PERMIT FEE($) ( JOHN STRUMSKI AREA(SQ FT) _ 1^ 1 i5000 I 18 ALDEN AVENUE OWNER 1BASSICK JOHN W BUILDING D Y .BUZZARDS BAY,MA 02632 ADDRESS [BASSICK SUSAN K,65 MARSHALL ST 'PPAAXTON MA 01612-1233 --(-27:C..--- PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK:1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: • 4 WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARM/F '� like (;)d 0i/%f✓ c..","He fizz lobj _:e . ITO Log on to www.BILCO.com to find �L` a sales representative near you. m,Miasoz'miff company Areaway— Sloped Masonry RECEIVED Classic Series SLW Doors 1. Discard your old door and measure the dimensions of the areaway foundation as shown. NOV 05 2018 2. Measure dimension W1,the inside width,and W2,the outside width of the foundation slope sig l_s__ , Walls may not be uniformly spaced,so check at several points for the narrowest dimension. BrUI LDING DEPARTMENT 3. Measure dimension L1,the inside length,and 12,the outside length of the areaway foundation. ---- Record your dimensions and make the calculation shown. 4. Select the widest and longest SLW Door from the table to the right that will fit between the foundation sidewalls.Frame length should be between 11+2"and 1.2.Frame length can be extended with optional extension panels. Sloped Wall Basement Door Dimensions or Inside Select 'Outside "Length Door Opening width Oerh.•) Door Width IU min- i (W1)of: Model max C(iiic,wh pad.) Mdb..l c.d.., ata rui. 36-41 SLW3641 451/4 6514-6711 57 30 }, �1*-• -''!, +�� 46-51 SLW4651 55% 6514.6714 - 57 40 _----r-z --;T::::::-J '---,,,::„';-°,:l.4--1,,,-::. e'",. 47-51 SLW4751 551x 74.4-77 67 40 - -14 "` "n 50-55 _ SLW5055 59'4 6711-7014 60 44 � ' f � = i"`�' - sF 54-59 SLW5459 6314 74'1-77 67 48 .-c z�'; ,,- Tr -� a ' p.- y- a . _ •The frame of the door must overlap the foundation sWon*by et least 2'on each side. �.;li. r � r i;'. ••The SLW door length is*Amiable for Installation flexibility. �* 41/4 L2 X , ,_ 14114. , '-•%bilhilb.‘„L\ c -.%.'""ka 1The i 4 14 1/41 4 1:I‘.- \\>-*\S- • ,` Record your foundation dimensions here ��� its Width Length W1 (minimum)= L1 +2" __ W2= L2=— Extensions are available to increase the door length in 6"and 12"sizes.Two or more extensions can be over-lapped to make longer extensions. Contact us by phone:800.854.9724 or email:residentialOBILCO.com 5 • yAlzrroUrN • an AmesburyTruth'company BILCO Ultra Series Basement Door Product Specifications Bulkhead door to basement shall be BILCO Ultra Series Size C land 6" (15.2 cm)or 12' (30.5 cm) extension, if required]. Door panels shall be constructed of high-density polyethylene and have a wood design and texture molded into the panels. Bilco products can withstand a minimum 200 lb live load. Hardware shall have a polyester powder coated finish and all fasteners shall be zinc-plated and chromate sealed for corrosion resistance. Basement door sill strip shall be constructed of extruded aluminum and an EPDM rubber header gasket shall be supplied for weathertightness. Door panels shall be equipped with motion dampers for controlled door operation and a slide bolt locking mechanism for areaway security. Manufacturer shall supply a five-year warranty against defects in material and workmanship.Installation shall be in accordance with manufacturer's instructions. The BILCO Company, P.O.Box 1203, New Haven,CT 06505 www.bilco.com