HomeMy WebLinkAboutReview Checklist7-,:P-rF`
TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: ' A.M.
Street:
Villag
Owner
Addre
Phone:
Lot
Zone of Contribution: In_
Commercial:
Out _I�/Acreage
Residential: t�
Floor Plan:
# Bedrooms:_�G
Installer:
,e-
Phone:
V,' � -�
Builder: Engineer: W�
Address: Phone: -
Phone: 4 U2-r� .�
1. Required # of copies received
2. Date of soils exam and percolation
3. 4-5 ft of naturally occurring ervioL /
4. Foundation 2 ft above high point of l e
5. Water line 10 ft from septic compor
6. Benchmark indicated and shown - I
7. Septic tank minimum 10 ft from fouC�
8. Leaching minimum 20 ft full, 15 ft c
9. Leaching minimum 100 ft from wetl ,O'
10. Leaching minimum 150 ft from drini
11. Tank/leaching minimum 10 ft from I
12. System meets all other setback requi l P S
13. Uses adjustment for maximum high 1
14. Leaching set 4-5 ft above adj. water c � _-73'7 ' '
15. System not in top or subsoil (AB hoi
16. Proposed contours are suitable
N/A
YES
NO
�--�
�--
-�
17. System meets slope requirements - min. 1/8", 1/4" referred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel-�
21. No garbage disposal
✓�
22. System adequately sized for its intended use
23. Minimum 6" stone or compacted below tank and dbox
24. Manhole covers within 6" of grade, pump chamber cover to grade
L--�
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for du lexes
L�
27. Pump system -2" line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking
L--s
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stam s/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. # bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03