HomeMy WebLinkAboutEngineered Plan - 2018LOCATION -MAP
ASSESSORS MAP:
PARCEL: --- - - -
FLOOD ZONE: U�Ao - -- -
_
REFERENCE.-
76
S
TE8TO: � OLE t L.o�s° s�. '
1) The installation shall cornp� ivith Title V trod Town of V � lloard of
r. ` l lealth Regulations.
EVALU' TOR ,�>�UJ '
WITNESS: �_� �.
2) .The installer shall verify the location of utilities, sewer inverts and septic
DATE t `a-- i Zd components prior to installation and setting base elevations.
pEf1C4l.AT 0 RA E: Z I I I •' ; 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The First
tWo Teel out of the d-box to the leaching shall be level.
4) This plan is not to be utilized for property line determination nor any other
•,• TH- I . T11-2 I purpose other than ilia proposed system installation.
1p S) All septic components must meet Title V specifications.
b� 6) Parking shall not be constructed over 1-110 septic components.
7) The property is bounded by property corners and property lines.
Z:. 8) The property owner shall revieW design considerations to approve of total
1. 'design flow and numbed of bedrooms to be•considered for design. Receipt
r�(7. i of payment for the plan and installation based on the plan shall be deemed
approval of the design flow by the owner.
�j 9) The•existing leaching or cesspools shall be pumped and filled with material i
her Title V abandonment procedures. Those within the proposed SAS shall k
` be removed along Willi contaminated soil and replaced with clean sand per
� Title V specs,
10) System components to be 10 feet from water line. Sewer lines crossing the
Water line shall be sleeved with 4 inch SCI I`40 I'VC with ends gronted if
applicable. The proposed SAS is being installed below the water service
line. The line is to be sleeved as aforementioned and maintained in place.
S EP:T I C . SYSTEM. DES I GN 11) If a garbage grinder exists it is to be removed and is the responsibility of the
owner to ensure such.
'
i 12)The installer is to take caution in excavation around the gas line ifsneli
FLOWESTIMATE
- - � exists.
13)The installer shalt verify.the location quantity and elevation of the sewer
Z-L DEDROO�IS AT ��� GAL/DAY/BEDROOM -� GAt_/DAY ! , q ty ;
I� lines exiting the dwelling'prior to the installation. .
SEP I C TANK i 14) This plan is representative only that a system can fit on a property meeting
T i Title V requirements.
-'T OAL
-= GAL/DAY x 2 , DAYS.
USt .1000 GA(.;LON.,SEPT-IC TANK
6' M
S0l 1.:..AB ORPT) ON: SYSTEM
uAt,
2LJ�
AVID
-, � 1
SIDE Ati . ` - t : �
BOTTOM AREA: I �'�? O �-1 % Z�j,�✓ a �A5t7PJ
o No.1066 o y'
• �t.�g ��� � ` �Q/STERN
s't TAR►,�a �''�
,I SEA:T I C SYSTEM SECT ION ;
M
SEPTIC TANK
MAY ?4 2018'
HEALTH DEFT.
;�l x 2
��ar mrnth Iffeatth Depnrt ent
8 Ica
,awe Date
DATE IIEALTII AGENT