HomeMy WebLinkAboutEngineered Plan - Rev. 1998SOIL
TEST
PIT
DATA.
I
INDICATES Es�IM poi
SEPTIC TANK DETAIL:
, 50o GALLON
INDICATES -y
PERC. OBSERVED - SEASONAL, HIGH
NOT TO SCALE
TEST GROUND WATER GROUND WATER
5. INLET AND OUTLET TEES TO BE CAST IRON,
TP-1
TP-2
NOTES: 1. SEPTIC TANK SHALL BE STEEL
SCHED. 40 PVC OR CAST -IN -PLACE CONCRETE.
TEST PIT
TEST
PIT
REINFORCED CONCRETE.
TEES TO BE CENTERED UNDER MANHOLE COVER.
GRD. EL.
99.0
GRD.
EL. 97.5
2. SEPTIC TANK TO WITHSTAND H-10 LOADING
6. RECOMMENDED MANUFACTURER-ROTONDO OR
„ GW. EL.
<89•0
so GW.
EL. 87.5
I
UNLESS UNDER PAVEMENT, DRIVES OR
TRAVELED WAYS, WHEREIN H-20 LOADING
APPROVED EQUAL.
0 Fill, mixture 0
A and B soils
36"-
48"-
IMV
96" B 10YR5/6
Loamy Sand
Friable
Fill, mixture
A and B soils
A 10YR3/2,
Sandy Loam,
Friable
B 10YR5/6,
Loamy Sand,
Friable
C 2.5YR6/4,
Sand, Fine-Med.
Sand, Single
grained, loose
mottles 0120"
120" J 1 132"
DATE:
DATE:
10-1-98
10-1-98
TEST BY:
TEST BY:
THE BSC GROUP, INC.
THE BSC GROUP, INC.
WITNESSED BY:
WITNESSED BY:
AMY VAN .HONE
AMY VAN HONE
PERC. RATE:
PERC. RATE:
<2 MIN./INCH
<2 MIN./INCH
SOIL EVALUATOR
SOIL EVALUATOR
J. DONOVAN
J. DONOVAN
SOIL CLASS:
I
SOIL CLASS:
I
L.T.A.R.
L.T.A.R.
0.74 G.P.D./SQ.FT.
0.74 G.P.D./SQ.FT.
DATUM:
VERTICAL DATUM:
ASSUMED BENCH
BENCH MARK USED:
PK NAIL SET IN STREET ELEVATION = 100.00'
I
0
L
Co
Cn
m
CD
00
Cn
Cn
m
0
m
c
0
m
0
Ln
LO
m
0
1.0
v
m
co
0
U
CD
CD
m
a
CD
00
co
Q
a
i
a
PROFILE: NOT TO SCALE
EL.= 101.67
FIRST PIPE LENGTH
TOP FOUNDATION
MANHOLES & COVERS AS REQUIRED
TO BE SET LEVEL
EL.= EXIST
(BRING TO FINISH GRADE)
FOR MIN. 2'
2" MIN.
EL= 99.0
4" PVC (PERF) BREAKOUT
<n
"
4 PVC
SCH 40
4" PVC SCH 40
a
2 - 1
ro ro
- WASHED STO
8 3 8 DOUBLE SED
3/4"-1
1/2" DOUBLE WASHED STONE
=97.50
I=96.95
:.
g"
z
1=96.01
�=
1=97.20
1=96.45
5 OUTLET 11=96.20
r
EXISTING 1000 GALLON DIST. BOX
BOTTOM EL.=955
PRECAST CONCRETE
SEPTIC TANK
HIGH WATER EL.= 87.5
INSPECTION REQUIREMENTS AND SCHEDULE:
INSTALLATION OF THE SEWAGE DISPOSAL SYSTEM SHALL BE INSPECTED BY THE DESIGN
ENGINEER AND BY THE YARMOUTH BOARD OF HEALTH.
INSPECTION #1 - ENGINEER SHALL INSPECT WHEN THE REQUIRED EXCAVATION IS COMPLE,I
INSPECTION #2 - ENGINEER SHALL INSPECT WHEN CLEAN FILL WITH A PERCOLATION 1.
RATE OF LESS THAN TWO (2) MINUTES PER INCH HAS BEEN J
PROPERLY DEPOSITED.
PLEASE NOTE THE EXCAVATION SHALL EXTEND TO A MINIMUM DEPTH
OF 5 TO 10 FEET TO REACH THE PARENT MATERIAL.
INSPECTION #3 - ENGINEER SHALL INSPECT THE COMPONENTS OF THE SEPTIC SYSTEM
WHEN THEY HAVE BEEN INSTALLED.
THE DESIGN ENGINEER SHALL CERTIFY TO THE YARMOUTH HEALTH DEPARTMENT THAT
THE SEPTIC SYSTEM AND HAVE BEEN INSTALLED ACCORDING TO THE ENGINEERED PLAN.
En
w
TAPERED CLEANOUT PLUG
WITHIN 6" OF SURFACE
4" P.V.C. SECTIONS
4" SHORT CURVE P.V.C. PIPE
ro ro
4 x 4 PVC WYE �3,
AL CONC. BACKING BLOCK
P.S.I. IN 28 DAYS
12" •
II
4"x4"PVC WYE
-Q TAPERED CLEANOUT PLUG
TO D-BOX
TO SEPTIC TANK
I
CLEAN -OUT DETAIL
NOT TO SCALE
SHALL APPLY.
3. ALL PIPE CONNECTIONS AND CONCRETE
DISTRIBUTION BOX DETAIL: NOT TO SCALE
NO. OF OUTLETS J
s
` FINISHED GRADE
�j NOTES:
REMOVABLE 2" WALLS 1. DIST. BOX TO WITHSTAND H-10 LOADING.
COVER 'i
+ »
UNLESS UNDER PAVEMENT, DRIVES OR
CONSTRUCTION SHALL BE WATERTIGHT. v v • •+.v v • +•v v • • • • v • • + 2 PVC BARRIER TRAVELED WAYS WHEREIN H-20 LOADING
4. FILL ALL UNUSED KNOCKOUTS WITH TT SHALL APPLY.
MORTAR. »
3-24 DIA C-I. (60# MIN.) MANHOLE COVERS -� 15" Z. PROVIDE INLET TEE OR. BAFFLE WHERE
BROUGHT TO FINISH GRADE �I T SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR
TEE TO BE UNDER -
12" MIN. " 6"� 5,5" OUTLETS : 8 IN PUMPED SYSTEM.
M.H. OPENING7 r COVER 3 - ,
24" DIA. �4"ds4 "bid T 3. FIRST TWO FEET OF PIPE OUT OF DIST.
RAISE M.H W/ ► epg �o�goo �����,�� �, erg, L- 2» BOX TO BE LAID LEVEL.
10'-6" SEWER BRICK `.:•: : BOTTOM ON LEVEL
» &MORTAR » STABLE BASE 6" MIN. 3/4- TO 4. RECOMMENDED MANUFACTURER-ROTONDO
10 -0 NORMAL WATER LEVEL12 CROSS-SECTION 1 1 /2" CRUSHED OR APPROVED EQUAL
" STONE BASE 5. ALL PIPE CONNECTIONS AND CONCRETE
.., 3
10" 20 CONSTRUCTION SHALL BE WATERTIGHT.
PRECAST SEPTIC TANK ,
INLET TEE 4'-9" 30 1 /2" 6. BRING ACCESS COVER TO WITHIN
6" OF FINISHED GRADE.
5 -2
" 4,_6
- 4'-0" MIN.'S � _r 15 1 /2" 7. FILL ALL UNUSED KNOCKOUTS WITH MORTAR.
Z
5,-8ro LIQUID DEPTH (GAS CONTROL) ? PRECAST DIST.
8. CONTRACTOR TO WATER TEST D-BOX TO
:. . I BOX INSURE THE LEVELNESS OF THE STRUCTURE
IL
AND THE OUTLETS.
a BOTTOM ON LEVEL STABLE BASE Ok
PLAN VIEW aci�io�/i ��U,a,�� 7 1 /2
6" MIN. 3/4" TO CROSS-SECTION VIEW PLAN VIEW
1 1/2" STONE
I!
NOTES:
CONTRACTOR TO VERIFY THE INTEGRITY OF THE EXISTING SEWER PIPE AND SEPTIC TANK €
PRIOR TO CONSTRUCTION. THE BOARD OF HEALTH SHALL BE NOTIFIED IN WRITING REGARDING
THE CONDITION OF THE PIPE AND TANK.
i
THE EXISTING TANK AND SEWER PIPE SHALL BE REPLACED IF THEY ARE CRACKED, LEAKING OR
IN A FAILED CONDITION. REPLACEMENT SHALL CONFORM TO TITLE 5 AND LOCAL REGULATIONS. j
ilv -We
3 pA w
NW(L 38030
tA1�
ul
s
r
EXISTING 1000 GALLON''
SEPTIC TANK
INV. IN = 97.20
INV. OUT = 96.95
co
1.
LOT 7
.I • ....
/ EXISTING
/
S6� ..
5 BEDROOM
,., !. I ,.,,.
3�540�
I' 'll / DWELLING
/
S. F
4
,P''
raal
I
I
:ItVa fi.. I
r'r I
H
r
INV. OUT
:.
r
, �I
�.,7.1
1(
�, �yh', �.. i
i• TOP OF
/
!
y
I , '
FOUNDATION
/ /
:.:..
CLEAN,, OUT
I .
PROPOSED 'I Lc / ......
DISTRIBUTION BOX >I• I ,..
96.45
INV. OUT = 96.28
REVISIONS
LEACHING FIELD DETAIL: NOT TO SCALE
N0. .DATE DESCRIPTION
1. 12 8 98 BOH REV'S
36" MAX .COVER
FINISHED GRADE
I °i/CAP ENDS
.4' TEE 4=VC�D•0
.._. ._.. -
"
PVC
ou o or ° or o� or o or o or o or ° ou o o� o ou o 0
fi<�j ��
GENERAL NOTES:
"fie
6' DEPTH
a�a�" °
1. THIS PLAN IS FOR DESIGN AND
LEVEL BOTTOM
CONSTRUCTION OF THE SEWAGE
38'
DISPOSAL FACILITY ONLY.
2. ALL CONSTRUCTION METHODS AND
PROFILE
MATERIALS SHALL CONFORM TO MASS.
36" MAX. - 12" MIN. COVER
D.E.P TITLE AND LOCAL BOARD
l
OF HEALTH REGULATIONS.
`2% MIN. FINISH GRADE 4" MIN. LOAM &SEED
3. ALL PIPES LOCATED UNDER PAVEMENT
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL.
-
34 MAXIMUM
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
I _.:"•, ..:...:.::• : ••..: •.:... ••,• .: ...._:.:.._.,.. _• ...
T
PROPOSED LEACHING ACILITY OR
T
o
ANY KNOWN WELLS PROPOSED WITHIN
`�o u4'"o +,• o �•,.�po �o t•.>po o +� o v o , o 2
6 » MIN. OF 1 /8 » TO
150' OF ANY KNOWN LEACHING FACILITY.
1 2- WASHED STONE
/
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL, SUBSOIL AND OTHER
I 4' I %I' I 4' I 4' I _ 4' _ I
' "T�-1
IMPERVIOUS MATERIAL.
I' T' I (NP)
6. REPLACE WITH CLEAN WASHED SAND
3/4" TO 1-1/2" DOUBLE
OR OTHER CLEAN GRANULAR SOILS
WASHED STONE (NO FINES) CROSS-SECTION
CONFORMING TO THE FOLLOWING
SIEVE ANALYSIS:
10% (MAX) BY WT. SHALL
INVERT ELEVATIONS.
PASS No. 50 SIEVE
SIEVE SHALL
<10 % OF No. 4
E
PASS No. 100
FINISHED FIRST FLOOR 101.67
<5 % OF No. 4 SIEVE SHALL
4" INVERT AT BUILDING 97.50
PASS No. 200
UNIFORMITY COEFFICIENT 0 No. 4
I;
4" INVERT AT SEPTIC TANK (IN) 97.20
SIEVE </=6.0
4" INVERT AT SEPTIC TANK (OUT) 96.95
7. EXISTING UTILITIES WHERE SHOWN
IN THE DRAWINGS ARE APPROXIMATE.
4" INVERT AT DIST. BOX (IN) 96.45
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
4" INVERT AT DIST. BOX (OUT) 96.28
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
INVERTS AT LEACHING FACILITY:
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
4" INVERT AT BEGINNING
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
OF LEACHING TRENCH 96.20
AT. TEL. 1-800-322-4844. THE
S
ENGINEER DOES NOT GUARANTEE
ti
4" INVERT AT END
THEIR ACCURACY OR THAT ALL
OF LEACHING TRENCH 96.01
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATION AT BOTTOM
ELEVATIONS OF UNDERGROUND UTILITIES
95.5
TAKEN FROM RECORD PLANS. THE
OF LEACHING TRENCH
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
ESTIMATED GROUNDWATER
AND STRUCTURES AS REQUIRED PRIOR
ELEVATION 87.5
TO THE START OF CONSTRUCTION.
LOT
v
V I I''' I, Ili 1.1 41 lVj.. I..' ��/
I..
2 LOT 3
Q w �- 37 ;,., r
cn0
0. LOT 6
r ,o
N/F PK NAIL
J. AGNES GRADY SET. ELEV 9
ASSESSORS MAP 32 100.00'
0 PARCEL X6
19710f S.F. ;i.....
,rrr.r a.
LOT 2
/ 1
R=10.00 r
A=24.53' r
PLAN VIEW
SCALE: 1" = 20 FEET
LOT 1
i
8. THIS SYSTEM IS NOT DESIGNED FOR
THE USE OF A GARBAGE GRINDER.
A GARBAGE GRINDER IS NOT
RECOMMENDED TOIZE
DESIGN CRITERIA" ADVERSE IMPACT'SETO THE C EA'CHING
FACILITY.
N F
DESIGN LOW:
5 BEDROOMS AT 110 G.P.B. D 550 G.P.D.
/ _ _
REQUIRED SEPTIC TANK:
550 x 2 = 1100 GAL.
SEPTIC TANK PROVIDED: = 1500 GAL.
r
The BSC Group, Inc.
SIZE OF LEACHING FACILITY REQUIRED:
DESIGN PERC. RATE: 5 MIN./ INCH P.O. BOX 969
WEST YARMOUTH, MA 02673
LONG TERM APPL. RATE 0.74 G.P.D/S.F.
(508) 778-8919
550 G.P.D./O.74 G.P.D./S.F. = 743 S.F.
PROJECT TITLE:
SIZE OF LEACHING FACILITY PROVIDED:
LEACHING FIELD 38' X 20' = 760 S.F. SEWAGE DISPOSAL
760 S.F. PROVIDED > 743 S.F. REQUIRED SYSTEM REPAIR
760 S.F. x 0.74 G.P.D./S.F. = 562 G.P.D.
9 JAY BIRD LANE
W. YARMOUTH
-M ASSACH U SETTS
LOCUS PLAN: NO SCALE HOF
19 1 r� . IVIL
3"
N
\ ROAD
N BUCK ISLAND ��•yo
o JABEZ NEDS PREPARED FOR:
POND MARIE E. DUKE
4 STRATHMORE LANE
MADISON, CT 06443
LOCUS ����� DATE: OCTOBER 29, 1998
�P
COMP./DESIGN: S. TURNER
C2 CHECK: J. BURKE
�C,DRAWN: S. TURNER
FIELD: P.H / N.R.
28 FILE NO. 8016-SEP.DWG
BERRY ( [ DWG NO. 5113-02 SHEET 1 OF 1
AVE. JOB NO.4-8016.00
U"L' U :) 1.):Ju
HEALTH DEPT.