Loading...
HomeMy WebLinkAboutBLD-19-003015 VECTOR E fl O I Il E E R 9 RECE1 EL ; Project Number: U2041-1948-192 L JAN 112019 January 10,2019 Trinity Solar BUILDING DEPARTMENT 20 Patterson Brook Road,Unit#1 ar' W.Wareham,MA 02576 ATTENTION: Ashley Grey REFERENCE: Victor Shukhat-Post Install Residence: 76 Captain Weiler Road,Yarmouth,MA 02664 - Solar Panel Post Installation Letter Dear Ms.Grey: Per your request,we have reviewed photographs and a post-installation checklist for the above-referenced site. Based upon our review, it is our conclusion that the installation of solar panels on this existing roof occurred in accordance with the building code and our original requirements as stated in a letter dated November 8,2018. Rafter size and spacing has been verified to match the original design. Water damage was not encountered during work on and under the existing roof. No pre-installation splits,cuts,breaks,or visible sagging was encountered in the existing roof framing. After installation was complete, it was verified that all roof-penetrating fasteners actually penetrated into the roof framing and did not visibly split the framing members. No existing damage to any existing structure was discovered and no damage was caused to any existing structure during installation, according to the installer. All roof penetrations were sealed and flashed as a means of waterproofing. Our conclusions are based upon our review of the photos and a checklist prepared by the installer. This letter does not waive the installer of any responsibility for improper installation. As stated in a previous letter, our conclusion regarding the adequacy of the existing roof is based on the assumption that all structural roof components and other supporting elements are in good condition. We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your convenience. • Very truly yours, • VECTOR STRUCTURAL ENGINEERING,LLC -ROGER T, ALWORTH CIVIL ., / No.4 774 0 • ROger Digitaly signed by RogerAroih \ CC!: sQ` Alworth "bisiO ' a 4. 7o 'SYON .�Na Roger T.Alworth,P.E. MA License:47740—Expires:06/30/2020 01/10/2019 • Principal RTA/rsl 651 W. Galena Park Blvd., Ste. 101 /Draper, UT 84020/T (801) 990-1775/F(801) 990-1776/ www.vectorse.com pf'�'AR TOWN OF YARMOUTH Building Department BUILDING 2^� �0 (508)398-2231 ext.1261 p�`�� PERMIT NO BLD-19-003015 PERMIT Cr Mat ;mss ISSUE DATE 11115/2018 JOB WEATHER CARD APPLICANT ;Trinity Heating and Air DBA Trin PERMIT TO Repair AT(LOCATION) 176 CAPT WEILER RD,SOUTH YARMOUTH,MA 02 I ZONING DISTRICT ( I Bldg.Type: DRi esidential SUBDIVISION MAP BLOCK LOT 077.132 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Install 3.465kw solar panels on roof.Will not exceed roof panel,but will add 6" CONTRACTOR to roof heIght. 11 total panels. LICENSE 088720 Construction Supervisor Trinity Heating and Air DBA Trinity Solar AREA(SQ FT) `777,981,6001 EST COST($) 13000.00 PERMIT FEE($) 150.00 Paul Eaton L 20 Patterson Brook Rd.Unit 1 OWNER ISHUKHAT VICTOR J1 W.Wareham,MA 02576 BUILDING DEPT ADDRESS SHUKHAT MARINA J,76 CAPT WEILER RD SOUTH YARMOUTH IMA 102664 I / PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL II'JSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: 1 WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARf1VF