Loading...
HomeMy WebLinkAboutBLD-19-002982 •Y- TOWN OF YARMOUTH Building Department BUILDING **• �G (508) 398-2231 ext.1261 pti. c PERMIT NO 'BLD-19-002982 PERMIT ?s. ;;i° ISSUE DATE :11/15/2018 4. JOB WEATHER CARD APPLICANT (JONATHAN WHIPPLE I PERMIT TO I Repair AT(LOCATION) 125 AMY LN,YARMOUTH PORT,MA 02675 I ZONING DISTRICT ( I Bldg.Type: Residential I SUBDIVISION MAP BLOCK LOT 123.66 J BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Insulate attic and air sealing CONTRACTOR LICENSE 1192399 (Home Improvement AIR TIGHT INSULATORS LLC Jonathan Whipple AREA(SQ FT) L$88,234,240. EST COST($) 4308.63 PERMIT FEE($) 35.00 137 John Vertente Blvd New Bedford, MA 02745 OWNER 'M_INC NIS IRENE M r BUILDING DEPT Y ADDRESS 1,25 AMY LN_ -1 _ YARMOUTH PORT MA 02675 ✓_may, PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT. SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS I OTHER: I WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARCH/F