HomeMy WebLinkAboutBLD-19-3182 emet0c, iifan )181
Of'YAR TOWN OF YARMOUTH Building Department BUILDING
2f� ; S (508)398-2231 ext.1261
p�� y PERMIT NO BLD-19-003182 PERMIT
��:•:...;Y ISSUE DATE 11!27!2018 .wv JOB WEATHER CARD
APPLICANT Craig P Bishop PERMIT TO ' Repair
AT(LOCATION) I4 WINDMILL LN,WEST YARMOUTH,MA 02673 I ZONING DISTRICT I I Bldg.Type: 'Residential
SUBDIVISION MAP BLOCK LOT 1020.49 BUILDING IS TO BE: CONST TYPE USE GROUP L
REMARKS Air Sealing&Weatherization CONTRACTOR _
LICENSE 'CS109777
Construction Supervisor_
'CAPE COD ENERGY SOLUTIONS
ILLC
AREA(SQ FT) 303,613,200. EST COST($) 12r 129.70 PERMIT FEE($) 35.00 Craig Bishop
__ 378 Route 130
OWNER [TALE MICHAEL P Sandwich,MA 02563
___ BUILDING DEPT BY
ADDRESS VITALE BARBARA A.31 KEARNEY D(2- 1 J /� vr' ,, /� —
LOWELL IMA 101852-4330 BAczdc lr')Lixy� ISM PHONE E.----
I _
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDE Wa/LINE OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK:1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL. PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARr1\/F