Loading...
HomeMy WebLinkAboutEngineer's Report 11-30-2018 RECEIVED 111 l J November 30,2018 DEC 03 2018 ...r . r.. ... L * ti BUILDING DEPARTMENT tc Mr. Mark Grylls By _ M c K E N Z I E Building Commissioner ENGINEERING Town of Yarmouth CONSULTANTS 1146 Route 28 °'"`"11 "-1"“ =" filern"I South Yarmouth MA 02664 r t�rl) plY Y l fi p M1 i:YYtfix ?y;/qg RE: Egress Inspection,Grill 43, 43 Route 6A,Yarmouthport Dear Mr. Grylls, 0, McKenzie Engineering Consultants,Inc. completed an egress inspection of the e exterior egress stairway for the second floor at the building located a 43 Route 6A in Y.•..,outhport known as Grill 43 as required by the 9th edition of the Massachusetts Building Code. The wood framed landing and stairway was inspected during the site visit. The landing and stairway is in structurally excellent condition with no items requiring any repair actions at this time. r s Based on the inspection,we hereby certiif that the exterior egress comp.,.n..As at 43 Route 6A are structurally adequate to perform the functions for what they were designed to in accordance with the standards of public safety at the time of original construction and in accordance with Section 1001.3.2 of the 9ih edition of the Massachusetts Building Code. If there are any questions on this matter,feel free to contact me at any time. » F KAcr Sincerely, r1/4 �' MARX a 3` CKFIVIC ,I o. I ,8 M ls/A.Mc c er:5 1:K P e McKenzie •Lie onsultants,Inc. IV cc. Stephen Baroni P.O.Box 1879 44 Underpass Rd Unit 2 Brewster,MA02631 1774.353.2144 (774.353.2142 www.mckenglneers.con