Loading...
HomeMy WebLinkAboutBLD-19-3841 p4 BAR TOWN OF YARMOUTH Building Department / BUILDING O (508) 398-2231 ext.1261 C PERMIT NO :BLD-19-003841 \ PERMIT y 0,1\ c‘ � ;•„�;; ISSUE DATE ;01/02/2019 \ JOB WEATHER CARD • APPLICANT ;Anne Altieri 1 PERMIT TO Repair AT(LOCATION) 126 RUNE STONE RD.SOUTH YARMOUTH,MA 02 1 ZONING DISTRICT I j Bldg.Type: (Residential 1 SUBDIVISION MAP BLOCK LOT 101.89 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS REPLACING OLD ROOF WITH NEW CONTRACTOR LICENSE 1 AREA(SQ FT) 664,115,760. EST COST($) x0000.00 PERMIT FEE($) 140.00 OWNER Anne Altieri BUILDING DEPT BY ADDRESS Jorge Mendoza-Iturralde,26 RUNE STONE RD SOUTH YARMOUTH —7,MA 102664 ah2Ct i it�C"q/ PHONE 6179572099 THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT. SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK:1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARrI\/F