Loading...
HomeMy WebLinkAboutBLD-19-3739 pF'YAR TOWN OF YARMOUTH Building Department BUILDING Z�c 4 (508) 398-2231 ext.1261 D. Ilit:- �. \ p ,,.. y PERMIT NO BLD-19-003739 CT\� PERMIT ?•y wnrncn (�'r •ISSUE DATE 01/02/2019 • 6' • JOB WEATHER CARD APPLICANT ;Craig P Bishop I PERMIT TO l Repair AT(LOCATION) 110 OVAL DR,WEST YARMOUTH,MA 02673 I ZONING DISTRICT I I Bldg.Type: !Residential SUBDIVISION MAP BLOCK LOT 028.178 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Repairs-Air Seating and Weatherization/insulation CONTRACTOR LICENSE Massachusetts Construction Supervisor Cape Cod Energy Solutions Craig Bishop AREA(SQ FT) 683,107,920. EST COST($) 7354.00 PERMIT FEE($) 35.00 378 Rt 130 Sandwich,MA 02563 OWNER TAYLOR CLIFFORD J TR BUILDING DEPT BY ADDRESS THE C J TAYLOR TRUST, 10 OVAL DR "" ��/� WEST YARMOUTH IMA 02673 y',id.,2./gt^ef�jy�..� PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SID K OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARCVP