HomeMy WebLinkAboutBLD-19-003705 pf'YA, TOWN OF YARMOUTH Building Department BUILDING
2 il44' (508) 398-2231 ext.1261 .�,
� C
O ... y PERMIT NO :BLD-19-003705 L \\\ PERMIT
�rs:T s1 0 ISSUE DATE ;0110212019 JOB WEATHER CARD
APPLICANT ;Tara Lynn Maher PERMIT TO : Repair
AT(LOCATION) 133 MORNING DR,SOUTH YARMOUTH,MA 02664 I ZONING DISTRICT I I Bldg.Type: (Residential
SUBDIVISION MAP BLOCK LOT 042.74 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS insulate attic with cellulose CONTRACTOR
LICENSE CS-109089
Construction Supervisor
!MICHAEL MAHER
MICHAEL MAHER
AREA(SQ Fl) 910,796,040. EST COST($) 11652.83 PERMIT FEE($) 35.00 P•y Box 6413
Plymouth,MA 02360
OWNER BEAL EVELYN M(LIFE EST)
BUILDING DEPT BY
ADDRESS ,33 MORNING DR n
SOUTH YARMOUTH MA 102664 Z�'I'I SQA O /gril PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SID ALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK:1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
•
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARrI\/F