HomeMy WebLinkAboutEngineered Plan - 2018• AssEssoRs MAP: -- ___:-- . '=TEST ' 1-101-E j LOGS
o wall T It e 1 I ow :f Dare
Shall c rut � 'lu
. PARCEL:
I) The installation sh �I " I V tm� "' n c � h tot
.� ��D�. %y�� llealllt Regulations.
i
SO I L�: EVALUATOR: � _ '
' FLOOD ZONE: /<l0% 5 '� .__ _: WI TNES3: �IoG�J �l 2) .The installer shalt verify ilea location of utilities, sewer inverts and septic
-/Z Z� components prior to installation and selling base elevations.
REFERENCE: DATE t.:. ,
)' e�t A- �%1 1 , : 3) All gravity septic -piping to be 4 inch Sch 40 PVC at I/8' per foot. The first
�' _... � 'PERCOLATION ; iiATE:� �
' lWo feet out of the d-box to the leaching shall be level.
`�. h This plan is not to be utilized for property line determination nor any other
jZDOT Z-� ���� TH- 2 { q)
_ ,.__. : TN I I purpose other than the proposed system installation.
5) All septic components must meet'Cille V specillcations.
_� �� )��QZ✓� 6) Parking shall not be constructed over 1-I10 septic components. j
' 7) ;fhe property is bounded by property corners and property lines.
!� 8) The property owner shall revieW design considerations to approve of total
�r design flow and numbet of bedrooms to be'considered for design. Receipt
l . g
LOCATION MAP ,t, v- i of payment for the plan and installation based cm the plan shall be deemed.
�I l approval of the design flow by the owner.
leaching or cesspools shall be pumped and filled Willi material 9) `I he existing l g p p p i
her Title V abandonment procedures. Those within the proposed SAS shall ti
�TT`f✓' ` �% be removed along Willi contaminated soil and replaced with clean sand per
c
fills V specs. • .
ry1 , 10) System components to be 10 feet from water line. Sewer lines crossing the
0 V, j water line shall be sleeved with 4 inch SCI 140 PVC Willi ends grouted if
applicable. The proposed SAS is Being installed below the water service
iine. The line is to be sleeved as aforementioned and maintained in place.
SEPTIC SYSTEM DES GN 11) if a garbage grinder exists it is to be removed and is the responsibility of the
owner to ensure such.
p l
I l2)'fhe installer is to take caution to excavation around the has line tf sncli
- FLOW' EST I MATE
---- � � . exists.
Z� 13) The installer shall veri the location, quantity and elevation of the sewer
�- -_ BEDROOMS AT IlO GAL/DAY/BEDROOM 2 GAL/DAY t �'• .
_ lines exiting the dwelling'prior to the installation.
14) This plan is representative only that a system can fit on a property meeting
SEPTIC TANK
w!_ i Title V requirements.
O GAL
Z- GAL/DAY x 2 DAYS
USE I��'0 GA;:LON SEPTIC.: TANK T1
• �1�kl7fZ,1%
SO 1 L � ABSORPT I SYSTEM
WOW''!tlaFdcc, i
/� SIDE ' d+rlEA:
7- zai tie xzx o, I I �, 7 Z �.DAVen t
\��vL , - 2-7 MASori RI
BOTTOM AREA: Inc c - ��J l�� p - v ,p No. 1066
Wf lfml L-1 �-Yv? '11TABI 2: C)
o YSTEM -SECT I ON -
IC s.
a. m
�I N
WG
a►��—
A
I Cy
h > t t a
W1
GAL1TZ
SEPTIC TANK
k1 ,
to O r'jlu
oo.,SITE AND SEWAGE PLAN
X
LOCATION .Z-J
Va:•r�ooth health Dep�aa•zznent
FP OVEJ D PREPARED FOR
I�Irr�e t
- 13�te SCALE: I—rr—
DAV I D a MASONII DATE t io i Zola
DBC ENVIRONMENTAL DESIGNS
-- EAST SANDW I CN, MA
DATE ICA.TI Ao�IT
(508) 833-2177
c
!
'
I
i
I
�
I
i
'
1
I
i
l
I
I
i
i
i
!