Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2004SYSTEM PROFILE TOP FNDN. AT EL. 18.5' (VARIES) NOT TO SCALE) ACCESS COVER TO WITHIN 6" OF FIN. GRADE ACCESS COVER (WATERTIGHT) TO /18.5' MINIMUM .75' OF COVER OVER PRECAST % WITHIN 6" OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM, • " NOTE: 2' DROP BETWEEN INLET * INVERT AND OUTLET INVERT RUN PIPE LEVEL 2" DOUBLE WASHED PEASjONE FOR FIRST 2 / PROPOSED 15QO If GALLON SEPTIC 15,86' 16.D3' TANK (H- 10 ) GAS ' BAFFLE 15.51 ! 0 15.44' o (1.4 % .SLOPE) �_6" CRUSHED STONE OR MECHANICAL go 0.58' COMPACTION. (15.221 [2)) ao�$ DEPTH OF FLOW = 4' ( 2 % SLOPE) (1 % SLOPE) TEE SIZES: INLET DEPTH = 10" 3/4" TO 1 1 /2" DOUBLE WASHED STONE OUTLET DEPTH = 14" LEACHING FOUNDATION- 27 SEPTIC TANK 18 D' BOX 9 ti TEST HOLE LOGS PROVIDE INSPECTION PORT WITHIN RICK JUDD, RS 6" OF FINISH GRADE ENGINEER: WITNESS: D. FLAHERTY, RS DATE: 7/15/04 3' MAX. PERC. RATE _ < 2 MIN/INCH 15.86' CLASS I SOILS P# ELEV. 14.86' 0" 18.0' 0 FILL 54 13.5' FACILITY 4' *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL WELL: MIW 29 BUILDING SEWER OUTLETS AND ELEVATIONS ZONE: A PRIOR TO INSTALLING ANY PORTION OF + 18.4 PERc ® C ADJ: 1.7' SEPTIC SYSTEM VARIANCES REQUESTED UNDER MAX. FEASIBLE VF SAND COMPLIANCE 15.405: USE ADJ. WATER AT EL. 2.5Y 6/4 (10' TO 6') IN SETBACK, SAS TO LOT LINE t 16.8 10.86' 1 is REDUCTION IN SEPARATION TO GROUNDWATER (5' TO 4') f i 18.3 16.x / 6.8 I1 _ 16,15 r ANE _ -A ---- :- - - fl ------ L�T s2.5o 19.1 LOT 22 � I z��� 18.3 8,498t SQ. FT. 3 1 .3 REQUIRED I I I 1g.3 5' REMOVAL OF UNSUITABLE SOIL AROUND PERIMETER OF LEACHING FACILITY, W_�__.__W..- 18.3 PAVED DOWN TO SUITABLE SOIL LAYER (TO C LAYER DRIVE I - SEE TEST HOLE LOG). REPLACE WITH CLEAN 13 MED.SAND. I EXIST. DWELL. o ,\cat 18.0 (CRAWLSP) cD rn `' 19.5 1 0) 18.3 + 18.1 8.9 18 19. I CONCRETE 8J C.0 1_. -}+ 18.E 18.3 PATIO - -} 1$.5 �O O -" - BENCHMARK - CORN. CONC. BULK HEAD EL. 18.9 34" MAPLE J + 18.2 SAV I I TREE + 1 .5 SHED + 18.8 (SUPPORT AS REQUIRED DURING CONSTRUCTION OF SYSTEM) 1 - 19, 19.8 '11 80.30' i 19.7 F + 18.6 �. + 18.2 + 18.4 i 04-176 lb: REDUCTION IN SETBACK, ST TO FOUNDATION (10' TO 8') 106" OBS WATER 9.16' 126" 7.5' NOTES: SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED - 1. DATUM IS - -- _ - DESIGN FLOW: 3 BEDROOMS ( 110 GPD) = 330 GPD 2. MUNICIPAL WATER IS EXISTING USE A 330 GPD DESIGN FLOW 3. MINIMUM PIPE PITCH TO BE 1 /8" PER FObT. SEPTIC TANK: 330 GPD ( 2 ) = 660 4, DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10 USE A 1500 GALLON SEPTIC TANK 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. LEACHING: ENVIRONMENTAL CODE TITLE V. SIDES: N/A 7, THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT 30 x 15 (74) TO BE USED FOR ANY OTHER PURPOSE. . _ BOTTOM: 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. - TOTAL: 450 S.F. 333 GPD 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT USE 30'x 15' LEACH FIELD OF 2 ROWS OF 4 INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. STANDARD INFILTRATORS EACH, WITH 3' STONE AT 10. PUMP & REMOVE EXISTING SEPTIC SYSTEM SIDES, 3.3' BETWEEN ROWS AND 2.5' AT ENDS LEGEND TITLE 5 SITE PLAN 100.0 PROPOSED SPOT ELEVATION F� OF 22 LITTLE DIPPER LANE 100x0 EXISTING SPOT ELEVATION IN THE TOWN OF: 10o PROPOSED CONTOUR (SOUTH) YA R M 0 U T H 12120)C0dGD 100 EXISTING CONTOUR SEP 2 8 2004 PREPARED FOR: REV. ROBERT GIGGI HEALTH ®EPT. 20 0 20 40 60 BOARD OF HEALTH / MA PPROVED DATE SCALE: 1 " = 20' DATE: JULY 17, 2004 J` REV 8/23/04 (MOVE SAS) off 508-362-4541 fox 506 362-9880 down cape engineering, inc, ZNOF 414S IV NO/O ARNE� H. � a Z6L0£ 'ON � CIVIL ENGINEERS OJALA 634, IIn10 0� H3N� 'V YORS LAND SUR E �o� / 0 g\ r o Y! 939 vain st. yarmouth, ma 02675 AP 0JALA, P. E.',r. .S. DATE