Loading...
HomeMy WebLinkAboutEngineered Plan - 2018KEY: N EXISTING CONTOUR: - - - - •------- --- O 0 PROPOSED CONTOUR: SPOT ELEVATION: 25.5 EXISTING PROPOSED SPOT ELEVATION: 25.5 I TEST HOLE: t� 3 UTILITY POLE: -p- - FENCE LINE: LOCUS HYDRANT:.-6- RETAINING WALL: LOT 5 (19 4771 SF) ASSESSORS MAP: 32 PARCEL: 53 PLAN BOOK: 275, PAGE: 1 MINIMUM BUILDING SETBACKS: FRONT: 30' SIDE; 15' REAR: 20' MAX BUILDING COVERAGE: 25% BENCHMARK AT MAG NAIL ELEVATION = 100,56 N Q OQ, � 100 z Y Z Q � /I 101 ,I � c a I f o I f 999 / f/ 101 SEPTIC SYSTEM DESIGN ( FLOW ESTIMATE: I` 4 BEDROOMS AT 110 GAL / DAY = 440 GAL / DAY SEPTIC TANK: 440 GAL / DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK 'LEACHING AREA: USE 6 -125 GALLON CHAMBERS (6.1' x 3' x 12" EFF. DEPTH) WITH 4' OF STONE ALL AROUND (44.6' x I V x 12" DEEP) SIDE AREA: (44.6' + 11') x 2 x 1 = 111 SF (0.74) = 82 GAL/DAY BOTTOM AREA: 44.6' x 11' = 491 SF (0.74) = 363 GAL/DAY CAPACITY = 445 GAL/DAY th-1 / 100 f DR SEp / L l 00•36 • �.,, rmn 10PPOP / 0ECK mlp 4,9 OSEp l� top n ON � vG /1 y bh 100-�'---- PEq i '6 - - - 100 9 /'L 99 98 98 s\ SEPTIC SYSTEM SECTION FIRST FLOOR 2" PEASTONE OR FILTER FABRIC 101.75 COVERS WITHIN 6" 3/4" - 1 1/2" DOUBLE OF FINISHED GRADE WASHED STONE FOU FOUNDATION nOP OF '" "`"° '` ` FINISHED G INSPECTION PORT BADE ELEV.= 98.68 1 /4" per ft 98.75 1/8"per ft COVER ELEV. ill (1' MIN) Q 8. 0 1/8" per ft EL2u1/EV. 98.06 8. ELEV. ELEV. 5 (( D-BOX ELEV. ELEV. 1500 GAL MECHANICALLY CALLY UNDER 4 ° ° H (g SEPTIC TANK 44.6' x 11' ((qq MECOHANIOCALLY COMPACTED) 91.85 6 -1WTTGALLON 4 OF STONE A LAROUNLC-6) C 6) 5.25' ELEV. (44.6' x 1 V x 12" DEEP) TEE SIZES: GAS BAFFLE INLET: 6" UP, 13" DOWN AT OUTLET TEE OUTLET: 6" UP, 14" DOWN ADJUSTED GROUND WATER ELEVATION = 91.6 w�ry 44.6' c T . . . . . . . . . . . . . . . • . . LEACH AREA DETAIL TH-1 TH-2 100.0 TEST HOLE LOGS O/A HORIZON ELEV ELEV. 0!A HORIZON ELEV. ENGINEER: THOMAS McLELLAN, P.E. LOAMY SAND 10YR 3/1 LOAMY SAND 10YR 311 7" 99.9 91, 99.3 WITNESS: AMY VON HONE, R.S. B HORIZON B HORIZON DATE: 5-24-18 LOAMY SAND LOAMY SAND 24" 10YR 5/8 98.5 30" 10YR 5/8 97.5 PERCOLATION RATE: < 2 MIN/IN C HORIZON I C HORIZON FINE-MED SAND FINE-MED SAND 2.5Y 7/4 PERK C AT 42" 2.5Y 7/4 USGS GROUND WATER ADJUSTMENT: WELL: MIW-29, ZONE: B, ADJUSTMENT: 0.6' 11 OBSERVED 108" OBSERVED 91.0ADJUSTED GROUND WATER ELEV= 91.6 +91,0 20" GROUND WATER0.5 120,11 GROUND WATER 1 90.0 NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4 PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/8" & 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D-BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. D-BOX TO BE WATER TESTED TO ENSURE LEVELNESS ANCLEQUAL FLQW�/��t�G%G�Q.� Yarmouth Health Department o 'fI:, 4 701.1 PPPRVED PEAL"fp-9 DE;PT Aime Date rf DECK 12'�������" [bh a CIVz±-• B p )'v- c-34 O� - PROPOSED?C 4 BEDROOM �SSru 11 ' DWELLING 26' 42' THOMAS J PROPOSED DWELLING SITE PLAN LOCATION: 34 ANTHONY RD., W. YARMOUTH, MA PREPARED FOR: DAVENPORT BUILDING CO. LTE: 9-12-18 SCALE: 1" = 20�, BASS RIVER ENGINEERING P E P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048 M 18-23