Loading...
HomeMy WebLinkAboutEngineered Plan - 1999/5- TO 1/2- LEGEND: VA 6 SHED STONE 4" CAST IRON PIPE VENT EXISTING SPOT ELEVATION 00.0 (OR EQUAL) MINIMUM NOT REQUIRED EXISTING CONTOUR ---- 00---- PITCH 1/4- PER FT. FINAL SPOT ELEVATION "M I CU. FT. OF CONCRETE FINAL CONTOUR FLOW LINE SOIL TEST LOCATIONI. 'W E rd ANCHOR UTILITY POLE ELEV. 10' TOWN WATER _TMIN. 2#00 4 CATCH BASIN V. 7 LEVEL 44 _!i�' GAS LINE ELEV. GAS ELEV. p ELEV. af ELEV. C.O. CLEAN OUT BAFFLE CESSPOOL DISTRIBUTION Aw C.P. C) ELEV. OUTLET ELEV. CITY INFILTRATORS WITH LIQUID HIGH CAPACITY -DEPTH TEEBOX STONE IN AN (TO BE PLACED ON FIRM BASE) 4 FEET INCHES TO BE WATER TESTED 5 FEET 19 INCHES 1 gVV) r� A I I r)KI (o x jo TRENCH FORMATION M r. = Ir IF MORE THAN ONE OUTLET DEPTH HORIZ TEXTURE MOTT. OTHER 1rA ki y,< A$ 1) 51s 5 F),M D QI pl. W, I IRY4 45 1> ye _3 5'4tuo &jy Alt iiv%.nr_a (-VWATER ENCOUNTERED AT 119b" ELEV. 8 FEET 34 INCHES WELL 7 FEET 29INCHES (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION SEPTIC TANK ZONE 3/4- TO 1 1/2--/ WASHED STONE SYSTEM (SAS) INDEX ADJUST DESIGN CALCULATIONS SEWAGE DISPOSAL SYSTEM PROFILE USGS PROBABLE WATER TABLE ELEV = NUMBER OF BEDROOMS OBSERVED WATER TABLE E NOT TO SCALE ELEV. = GARBAGE DISPOSAL UNIT NO BOTTOM OF TEST HOLE ELEV. = TOTAL ESTIMATED FLOW 110 GAL/BR./DAY X 3 BR.) 330 GAL/DAY REQUIRED SEPTIC TANK CAPACITY 1, t, 0 GAL ACTUAL SIZE OF SEPTIC TANK 1500_ GAL SOIL CLASSIFICATION DESIGN PERCOLATION RATE < 5 MIN.11N. EFFLUENT LOADING RATE OIL GAL./DAY/S.F. LEACHINQ AREA Sa FT. LTA 040 CH�IG CAPACITY (AREA X RATE) GAL/DAY x' 0,7 5/ yz? RESERVE LEACHING CAPACITY GAL/DAY Il. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND NOTES: FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). TITLE 5 AND THE TOWN OF __'L RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE f USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH -DEEDED OR ZONINC REGULATIONS. OWNER / APPLICANT IS TO OBTAIN -SUCH DEfkYmINAi_1U3 FTjOij APFROrAiATE Au-Nicilu'l.. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE 9. LOT IS OWN ON MAP AS PARCEL 10. EXISTING SHSEPTICS ARE TO BEASSESSORS PUMPED AND BACKFILLED. APR 2 8 1999 A(i 4 E HEALTH DEPT. wz-o'A ' Elt AF HE/ 'R 2 8 1999 L D _PT. T A 4 ul- - ------ - a APPROVED: BOARD OF HEALTH / /C�r: ^Y `�, 6u ' DATE AGENT c; :;�15 ^"�\ � '� `FF;4 � j v, PROPOSED SEPTIC DESIGN FOR 5b twiw D LAI it-1 6 E PROJECT LOCATION �/'7 l�Ut.D `i��A J, .�� j N �%A��f r7v7"N S WEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 JOB NO. REVISED LOCATION MAP REVISED SHEET OF j 01999 SWEETSER ENGINEERING