Loading...
HomeMy WebLinkAbout1999 Jun 29 - Site Plan Review; InfoTUESDAY, JUNE 29, 1999 STARTING AT 1:00 P.M., FOR THE FOLLOWING: 1. 1:00 P.M. LOT 77 (Mo02) MAP 98 (87) Mid -Cape Racquet & Health Club Robert Majewski [E C E 0d LE pp 193 White's Path c South Yarmouth, MA 02664 oo� Sys J U N 2 2 1999 l��` �l` r Y Replace tennis court gth a pool. �zx � IHEALTH DEPT. LOT MAP 3. LOT MAP ASSESSOR BUILDING DEPARTMENT CONSERVATION DESIGN REVIEW ENGINEERING DEPARTMENT FIRE DEPARTMENT HEALTH DEPARTMENT HISTORIC COMMISSION LOT MAP PLANNING DEPARTMENT WATER DEPARTMENT ECONOMIC DEVELOPMENT TUESDAY, JUNE 29, 1999 STARTING AT 1:00 P.M., FOR THE FOLLOWING: 1. 1:00 P.M. LOT 77 (Mo02) MAP 98 (87) Mid -Cape Racquet & Health Club 193 White's Path South Yarmouth, MA 02664 Replace tennis court with a pool. Robert Majewski 00` SK4S �Wt� /yvl 2. LOT MAP 3. LOT MAP 4. LOT MAP ASSESSOR PLANNING DEPARTMENT BUILDING DEPARTMENT WATER DEPARTMENT CONSERVATION ECONOMIC DEVELOPMENT DESIGN REVIEW ENGINEERING DEPARTMENT FIRE DEPARTMENT HEALTH DEPARTMENT HISTORIC COMMISSION J U N 2 2 1999 HEALTH DEPT. 10/20/89 V��-_Dw_� .SITE PLAN- IRIEW REQUEST AND PROJECT DESCRIPTION FORM SUBMISSION DATE G Z�I�g REVIEW DATE TIME 1'ev AM ASSESSOR'S MAP NO. ���a�� LOT LOCATION OF PROJECT: Ia 3 Wlnc+e-S ?°`-�t ' NAME OF BUSINESS/PROJECT : MicQ •' ♦ ��'�` ' APPL I CANT NAME: ROSS4LT wt PAcst'1,us V-4 APPLICANT ADDRESS/PHONE NO.: 1a3 VzW A -Cs OWNER NAME . (if not applicant) : "eant. W . OWNER ADDRESS/PHONE NO.: t 3q 81,6e_ 'Roc -tom . ENGINEER/SURVEYOR: TITLE REFERENCE: REGISTRY SURVEY: DESCRIPTION OF PROJECT (attach additional pages if necessary): • 'R, cow VZ Gk . 0., Tc ck . 1�oa1 be cove�.e� kh wivn� vv"• s �04 bw6614-_ . Note: Please see table 5, Site Plan Review Checklist., for the type of information required on a site plan. ZONING DISTRICT: FLOOD ZONE: BUILDING SIZE (square feet) Attach floor plans. BASEMENT: FIRST FLOOR:. SECOND FLOOR: MAXIMUM NUMBER OF EMPLOYEES: DO YOU USE/HANDLE/STORE OILS OR HAZARDOUS MATERIALS? NO IF SO, ATTACH LIST OF THEM BY NAME, QUANTITIES, AND PROPOSED METHODS, OF STORAGE/HANDLING/DISPOSAL, ETC. BOARD OF APPEALS ACTION EXPECTED: --------------------------------------------------------------- RT-28 PROJECTS ONLY PROJECTS FRONTING ON RT-28 WITH PROPOSED STRUCTURES/ADDITIONS HAVING 5000 SQUARE FEET OR MORE OF FLOOR AREA MUST FIRST BE REVIEWED BY THE RT-28 TASK FORCE. IF THIS HAS ALREADY BEEN DONE, ATTACH 8-COPIES OY-THE REVIEW FORM. IF NOT DONE, SUBMIT THIS FORM AND 1 COPY OF THE SITE PLANS TO THE PLANNING DEPT. IN ORDER TO BE PUT ON THE RT-28 TASK FORCE AGENDA. --------------------------------------------------------------- IS THE PROPOSED CONSTRUCTION WITHIN 100 FEET OF A WETLAND? -SIGNED �• ' respectfully submitt d .Submit 8 copies of this completed form and the site plan to the Bx;ilding Department in order to get your project on the Site Plan Review agenda. A 9th copy is required if within 100 ft. of a wetland. THE SITE PLAN REVIEW HEARING WILL BE IN ROOM A AT THE YARMOUTH TOWN HALL P(V T= l➢ Lv� OT�- 6 � c9q 1310. G U FZ F--;, Gam' A PIA LoT q 2 I_o3' F�o��e eox (Lo T 2 4 I GuCZP3 --�) 2 Ill _ :\ L77 L r-- �- \` 3- \\' 7.73 ro l.A:►.1D SU RVEYDRS g� � . � 3o�s2 � 'C�`.��e..���<9:r� fops �(,4Rl�1DUTN , Maw.!`1 °�l��a� LA MATE