HomeMy WebLinkAboutReview Checklist t 1 f r-6 TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
i Location: A.M. /5 / Lot 2 c Zone of Contribution: In Outer Acreage
Commercial: Residential: L/
Street: 2 7 1.1%
Village: (,� Floor Plan: t___ #Bedrooms:
Owner: Z.-(52,(:, .42tt' Installer: (Gz �C. "(1.7160:4424.44-
Address: - " Phone: -9 - -- /.(
Phone:
Builder: Engineer: i �fi�,' r G4i/
Address: Phone: �5
Phone: / w/I :f 7/ .y;/ /-/<.-/ 5
N/A YES NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years ‘..----
3.4-5
„o3.4-5 ft of naturally occurring pervious material, above water table k
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t___--
5. Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands L..--'--
7. Septic tank minimum 10 ft from foundation, deck Var.: , ,---
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,-._.-
9.Leaching minimum 100 ft from wetlands Var.: -
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: (I-
11.Tank/leaching minimum 10 ft from property line Var.: ___
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: .,__..- ,.
14.Leaching set 4-5 ft above adj. water or botto o test hole Var.
15. System not in top or subsoil(A,B horizons r 5_'removal
16.Proposed contours are suitable L ._._.-
17. System meets slope requirements-min. 1/8", '/4"preferred L.------
18.
- -'18. System meets breakout requirements PVC liner (Nall: ( _�-
19. Specified tee sizes are proper, gas baffle on outlet tee �-
20. Sewage is under 10,000 gpd for parcel ..--"
- 21.No garbage disposal ,...•..%----
22. System adequately sized for its intended use (..---
23.
"-
23.Minimum 6"stone or compacted below tank and dbox ti -
24.Manhole covers within 6"of grade,pump chamber cover to grade t
25.Inspection port on plastic chambers/leach field --
26.Electrical permit for pump chamber/Separate meter for duplexes ----
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ---
28. Septic tank/pump chamber to be factory waterproofed ------ ,..,
29. Vent provided if leaching below 3 feet, under driveway/parking _)
30. Buoyancy calculations for tank/pump chamber t
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature �_____-
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature \35.Foundation footing min. 2 feet above adjusted ground water for new house -------
36.
-----36.Deed Restriction required max. #bedrooms: max. flow: gpd --
37.Check area lots for groundwater/Label groundwater in Assessor's Ma
Plan reviewed by: �.,-� 6/03/03