Loading...
HomeMy WebLinkAboutReview Checklist /2- 1(C) TOWN OF YARMOUTH • SEWAGE PLAN REVIEW CHECKLIST 1 Location: A.M. f) Lot '1 Zone of Contribution: In Out -Acreage Q�� �'' Commercial: Residential: �-�Street: �� }17 e"�"� rie, G�� _ �4, 'vL Village: �? Floor Plan: f/ #Bedrooms: /�`�� Owner: h�(( 7 Installer: P24 q firr.9- Address: Phone: 4;-- c - 7a 2_-6 j 7 //,?./iy. ( /e/%2 Phone: 7 j,, Builder: Engineer: �U I �4 Address: Phone: 9f -r '4! ,&2?-7, ,9 Phone: i 7/7:: :7/ 46-'(//e4g72147 N/A YES NO 1.Required#of copies received (,`./ 2.Date of soils exam and percolation test not older than 2 years ---- 3.4-5 ft of naturally occurring pervious material, above water table ,. 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: _ 5.Water line 10 ft from septic components Var.: ( ___-- 6.Benchmark indicated and shown-NGVD if near wetlands .0 _ 7. Septic tank minimum 10 ft from foundation, deck Var.: t-_-- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ` �' 9.Leaching minimum 100 ft from wetlands Var.: ..m- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: - 11.Tank/leaching minimum 10 ft from property line Var.: (;.------- 12. System meets all other setback requirements Var.: , 13.Uses adjustment for maximum high groundwater Var.• g 14.Leaching set 4-5 ft above adj.water or bottom oftest hole Var.:: 15. System not in top or subsoil(A,B horizons or 5'removal t. 16.Proposed contours are suitable 17.System meets slope requirements-min. 1/8", 1/4"preferred k,,,,_,.y 18. System meets breakout requirements PVC liner: Wall: _ ‘......------ 19. _._19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel t._.----- '21.No garbage disposal 22. System adequately sized for its intended use c.__--- i 23.Minimum 6"stone or compacted below tank and dbox k------ 24. _...:�24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field .,.___- 26.Electrical permit for pump chamber/Separate meter for duplexes ----` 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size �_ 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet, under driveway/parking _✓ 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: ..._,---- 32. ,_.�32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater .....---- 34.Title V Application and permit fee, installer signature �. 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Ma Plan reviewed by: -,( .1 6/03/03