HomeMy WebLinkAboutReview Checklist f ‘2- TOWN OF YARMOUTHl/
/, 714
SEWAGE PLAN REVIEW CHECKLIST ,Z�: =� � L '
l4
l Location: A.M. (I Lot Cj Zone of Contribution: In 1/6rit Acreage 4 e /.---
'�� ,�J�`a, ` Commercial: Residential: (��
Street: /f/e / /
Village: 4/�� Floor Plan: �/ #Bedrooms: 2
Owner: Ail2t'1' ,,'Qis Installer: (- F
Address: Phone: ,1;i. /-- �//: '
Phone:
Builder: Engineer:Z �`� d, j'
Address: Phone: �f
Phone: t, 4 l'rt f eC _--
e
- N/A YES NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years (.------
3.4-5
.,,.>'''3.4-5 ft of naturally occurring pervious material, above water table (-------
4.
-_---'4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: l
5.Water line 10 ft from septic components Var.: t.------
6.
.-,/6.Benchmark indicated and shown-NGVD if near wetlands , ----
7.
/7. Septic tank minimum 10 ft from foundation, deck Var.: (__.----
8.
Ji8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,-----
9.Leaching minimum 100 ft from wetlands Var.: -
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: "--
11.Tank/leaching minimum 10 ft from property line Var.: ✓"
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: --
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: L.----
15. System not in top or subsoil(A,B horizons)or 5'removal 1.`_____
16.Proposed contours are suitable t___------
17. System meets slope requirements-min. 1/8", ' "preferred
18. System meets breakout requirements PVC liner: Wall: ....----
19. Specified tee sizes are proper, gas baffle on outlet tee L..-------
20.
.„-./20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal %// §4.' t! /u-v / y
>( ( �/ r,-____�
22. System adequately sized for its intended use /
: 23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade L--
25.Inspection port on plastic chambers/leach field --'
26.Electrical permit for pump chamber/Separate meter for duplexes ,..------
27.
...._...27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed .i--
29.Vent provided if leaching below 3 feet,under driveway/parking -------
30.
30.Buoyancy calculations for tank/pump chamber _------
31.
/31. Engineer to inspect and certify soils: wall: commercial: -----
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature _i--
33.14-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature --------
35.
,/35.Foundation footing min. 2 feet above adjusted ground water for new house ------
36.
y''36.Deed Restriction required max. #bedrooms: max. flow: gpd „--- �-
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: C
ill 6/03/03