Loading...
HomeMy WebLinkAboutReview Checklist t )--g' (7 TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 9. Lot 1. s Zone of Contribution: In Ou eage r -4 / �� .� Commercial: Residential-f'' Street: / / Village: eTtafij Floor Plan: C ---,""'l_ #Bedrooms:_. Owner: 0 5 Installer: 5 'fir/' Address: Phone: QV -ic, 'O'C/2-- Phone: Builder: Engineer: Aq Address: Z-- Phone: ,-/ -"� - '�&4 Phone: / 5e r 634Vidiihe,fr 3-4Va4V N/A YES NO _ 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years (..----- 3.4-5 -----3.4-5 ft of naturally occurring pervious material, above water table `---'' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: v..----- 5. i"5. Water line 10 ft from septic components Var.: L.--.a- 6. Benchmark indicated and shown-NGVD if near wetlands L.....----" 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: h', �� �� 9.Leaching minimum 100 ft from wetlands Var.: L------ 10. !10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: C 11. Tank/leaching minimum 10 ft from property line Var.: /,C'- (_,- 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 0,?c, OOP �o 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 1/4---- 16.Proposed contours are suitable %.........----- 17. ,/17. System meets slope requirements-min. 1/8", I/4"preferred C..------ 18. /18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee .,---- 20. Sewage is under 10,000 gpd for parcel c_...---- . 21.No garbage disposal C.----' 22. System adequately sized for its intended use c..®-- 23.Minimum 6"stone or compacted below tank and dbox L.------ /2524.Manhole covers within 6"of grade,pump chamber cover to grade LA------- 25. .Inspection port on plastic chambers/leach field L,....------ 26. !26.Electrical permit for pump chamber/Separate meter for duplexes ...---" 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size i.®"' 28. Septic tank/pump chamber to be factory waterproofed ...------- 29.Vent provided if leaching below 3 feet,under driveway/parking ..-------" 30.Buoyancy calculations for tank/pump chamber ./. 31.Engineer to inspect and certify soils: wall: commercial: ,/' 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature - 35.Foundation footing min. 2 feet above adjusted ground water for new house ..../- 36. 36.Deed Restriction required max. #bedrooms: max. flow: gpd /- 37.Check area lots for groundwater/Label groundwater in Assessor's Map ..--- - Plan reviewed by: �.! 6/03/03