Loading...
HomeMy WebLinkAboutApp-Permit-ComplianceNo. l q �3 COMMONWEALTH OF MASSACHUSETTS Board of Health, ��9-�-91.0 VT14 , Am. FEE f�°00 c005 APPLICATION FOP: DISPOSAL SYSTEM CONSTRUCTION PERMIT. Application fora Permit to Construct{ ) Repair,( ) Upgrade�ndonO - L9'Complete System O Individual Components Location Owner's Name i e G9/ U es, Map/Parcel# Address Lot# 2 Telephone# Installer's Name o Designer's Name 014 Address /t y Address �a �• L �jr% T Telephone# G� ®� Telephone# Type of Building Lot Size, sq. ft. Dwelling - No. of Bedrooms Garbage grinder( } Other -Type of Building No. of persons Showers ( }, Cafeteria ( ). Other Fixtures Design Flow (min. required) y �% 6 gpd Calculated design flow Design flow provided gpd Plan: Date / 2 — / Number of sheets / Revision Date Title Description of Soil (s) i'i G' 14 Soil Evaluator Form No. Name of Soil Evaluator /2o, 6,4.e DESCRIPTION OF REPAIRS OR ALTERATIONS Date of Evaluation �— v The undersigned agrees to install the above described Individual SewageDisposal System in accordance with the provisions of TITLE 5 -and• further agrees to not to place the s ysteip in operation until a Certificate of Compliance has been issued by the Board of Health. Signed_ Date ;Inspections i 0 �= a %�-} No. ✓` �' ` 4�/ � " { � _ r FEE COMMONWEALTH OF MASSACHUSETTS-). fle � _ -7 00 Board of Health, yo , MA. CERTIFICATE OF COMPLIANCE Description of Work: U Individual Components) Complete System The undersigned hereby certify that the Sewage Disposal Sy tem Constructed O , Repaired ( ), Upgraded { j,, Abandoned O` by re i 7w at fe has been installed in accorclance with the provisions 31.0 CMR 15.00 (Title 5) and th proved design plans/as-built plans relating to application No. 1� dated]` �l Approved Design Flow (gpd) Installer A4e ,e _ o %' Designer: ed, C c: 41, lY/,-Inspector: r 94Aa�',� Date: The issuance of this permit shall. not be construed as a guaran0e that the system will function as, designed. No. �� 1 _ FEE J, t✓' COMMONWEALTH OF MASSACHUSETTS Board of Health, ��O 1 4- MA. DISPOSAL SYSTEM CONSTRUCTION PERMIT Permission ishereebygranted to; Construct(t.,)" Repair( ) Upgrade ( ) Abandon ( ) an individual sewage disposal system as described described in. the application for Disposal System Construction Permit No �''401 •, dated 1110 ,s Provided: Construction shall be completed within tibs o , the date of this permit. All local con iti s must be met. Form 1255 Rev. 5/96 A.M."Sulkin Co: Chadestown, MA Datef tJ� ! e Board of Health