Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST __� Location: A.M. 51- Lot>7 ' L Zone of Contribution: In Out Acr.eage Street: 'v �-���r�� �� �� > Commercial: Residential: " � . Village: hi. 1°- Floor Plan: L----'" #Bedrooms: 2. 60V-C7/C/' Owner: Installer: � S Address: Phone: “,�'-- - 77_ - 7 Phone: `�� /��n/� Builder: Engineer: JC �(rG / Address: Phone: 1? � 7 .Z" Phone: �y t <� ;17 '���t L,�.t z c�J-��J N/A YES NO 1.Required#of copies received i 2.Date of soils exam and percolation test not older than 2 years 1.------ 3.4-5 ,,,-- --3.4-5 ft of naturally occurring pervious material, above water table c-------- 4. __,,�4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c 5.Water line 10 ft from septic components Var.: _ t,..-----' 6.Benchmark indicated and shown-NGVD if near wetlands �. 7. Septic tank minimum 10 ft from foundation, deck Var.: (------ ,---,----- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: cam, C-1 -- 9.Leaching minimum 100 ft from wetlands Var.: f -- 10. 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: --t- 11.Tank/leaching minimum 10 ft from property line Var.: C-'� ( , ,_____...- 12. __-�12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: `--- 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L_--- 15. System not in top or subsoil(A,B horizons) or 5' removal ,.-- 16.Proposed contours are suitable 1/4...--- 17. System meets slope requirements-min. 1/8", '/4"preferred ---- 18. System meets breakout requirements PVC liner: Wall: ...._.-- 19. Specified tee sizes are proper, gas baffle on outlet tee " 20. Sewage is under 10,000 gpd for parcel i._ 21.No garbage disposal --^ 22. System adequately sized for its intended use �.----'' . 23.Minimum 6"stone or compacted below tank and dbox 1/4.------ 24. --- 24.Manhole covers within 6"of grade,pump chamber cover to grade r,- 25.Inspection port on plastic chambers/leach field (.-------- 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed -- 29. 29.Vent provided if leaching below 3 feet, under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ;--'' 33.H-20 loading is subject to vehicular traffic, groundwater ,....----..- 34. i'34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house y�.--'� 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03