Loading...
HomeMy WebLinkAboutReview Checklist l� TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST/ Location: A.M. /� Lot / Zone of Contribution: In_ OutAcreage 62 f C/1 Commercial: Residential: Street: Village: Floor Plan: #Bedrooms: Owner: 0G12 ��fi gleaf-AlgInstaller: [/ �Gl 5 Address: Phone: c-6 " 7 Phone: Builder: Engineer: ��f✓E% Address: Phone: L Q cj, F '77" 5 � Phone: /////'' / t N/A YES ;-��NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table �-- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NG-VD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l�� 9.Leaching minimum 100 ft from wetlands Var.: ! *C 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: t 13.Uses adjustment for maximum high groundwater Var.: - 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee - 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox t 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes c 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed , 29.Vent provided if leaching below 3 feet, under driveway/parking - 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature _33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house - 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map --- Plan reviewed by: 6/03/03