Loading...
HomeMy WebLinkAboutReview Checklist f-21 7 TOWN O F YARMOUTH Zat(�/ ,Z. SEWAGE PLAN REVIEW CHECKLIST /..1(4 ,c 2 t2e161-1 • Location: A.M. //C--- Lot (72_ Zone of Contribution: Ind- 6ut_ Acreage/CI f,,. -- /`s��``"7 Commercial: Residential: v Street: CVillage: A 6 Floor Plan: 1./ #Bedrooms: %2--- • Owner: P1 K Installer: X-- 5 Address: Phone: 4 4� Phone: 45 lith, Builder: Engineer: he 5-5 /2 � ��f Address: Phone: --?� r ri i �/I Phone: 1&f / Q S Ole GG ayye'��/!!/m4 - N/A YES NO 1.Required#of copies received ��' 2. Date of soils exam and percolation test not older than 2 years t----- 3. -/3. 4-5 ft of naturally occurring pervious material, above water table L'r' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: (...--- 6. Benchmark indicated and shown-NGVD if near wetlands t/ 7. Septic tank minimum 10 ft from foundation, deck Var.: �/ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 4, �� (.----- 9. ./9. Leaching minimum 100 ft from wetlands Var.: 1.---' 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: c....----- 11. ss11. Tank/leaching minimum 10 ft from property line Var.: /,*-- Cll c---' 12. System meets all other setback requirements Var.: L/--. 13. Uses adjustment for maximum high groundwater Var.: i,.....---- 14. >14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: t---- 15. System not in top or subsoil(A,B horizons)or 5' removal L.------ 16. Proposed contours are suitable L....----- 17. System meets slope requirements-min. 1/8", 'A"preferred 18. System meets breakout requirements PVC liner: Wall: L...---- 19. Specified tee sizes are proper, gas baffle on outlet tee L.-e • 20. Sewage is under 10,000 gpd for parcel �,,. 21.No garbage disposal t---- 22. /22. System adequately sized for its intended use c..---' i 23.Minimum 6"stone or compacted below tank and dbox C..---' 24.Manhole covers within 6"of grade,pump chamber cover to grade t.------ 25.Inspection port on plastic chambers/leach field t/ 26. Electrical permit for pump chamber/Separate meter for duplexes L....---1 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size is 28. Septic tank/pump chamber to be factory waterproofed f 29.Vent provided if leaching below 3 feet, under driveway/parking La" 30.Buoyancy calculations for tank/pump chamber ..----. 31. Engineer to inspect and certify soils: wall: commercial: `/ 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signaturef_5 CD 33.H-20 loading is subject to vehicular traffic, groundwater L� 34.Title V Application and permit fee, installer signature - c..........-- 35. �35.Foundation footing min. 2 feet above adjusted ground water for new house �� 36. Deed Restriction required max. #bedrooms: 2-max. flow: ? gpd v----* 37. Check area lots for groundwater/Label groundwater in Assessor's Map �/ Plan reviewed by: 6/03/03