Loading...
HomeMy WebLinkAboutReview Checklist 7(e6-(l /7 �/ 7 TOWN OF YARMOUTH 44- , <, �J/� / , SEWAGE PLAN REVIEW CHECKLIST ,�'' `'7< Location: A.M. 41. Lot Zone of Contribution: ut Acreag t Commercial: Residential: Street: 40 / _ Village: /l. Floor Plan: #Bedrooms: 4 ' 1 Owner: i"16-644/ Installer: 414 3 4i Address: Phone: 47�2 - .,YS- c 9f Phone: 5 4P- )6 ( ' -324/ Builder: .yrue Engineer: // Address: Phone: !J�-0 ilr 74-3'11 Phone: N/A YES NO 1.Required#of copies received L.------.- 2. .---'''2.Date of soils exam and percolation test not older than 2 years c-,..-- 3.4-5 ft of naturally occurring pervious material,above water table c.---- 4. .--- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ._._----- 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: `s- 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: k.---" 12. System meets all other setback requirements Var.: �--- 13.Uses adjustment for maximum high groundwater Var.: `..--'" 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: (---' 15. System not in top or subsoil(A,B horizons)or 5'removal t..------ 16. 'f16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1 "preferred (....--- 18. System meets breakout requirements PVC liner: Wall: l__. - 19. Specified tee sizes are proper, gas baffle on outlet tee L_----- 20. Sewage is under 10,000 gpd for parcel �,.----- 21.No garbage disposal L.,---- 22. System adequately sized for its intended use c.;..... 23.Minimum 6"stone or compacted below tank and dbox L...-- 24.Manhole covers within 6"of grade, pump chamber cover to grade L./ , 25.Inspection port on plastic chambers/leach field �---- 26.Electrical permit for pump chamber/Separate meter for duplexes ---' - 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size .....-- 28. 28. Septic tank/pump chamber to be factory waterproofed -_'"- 29.Vent provided if leaching below 3 feet,under driveway/parking ----- 30.Buoyancy calculations for tank/pump chamber --- -- _ 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature _,-----' 33.H-20 loading is subject to vehicular traffic, groundwater ------ 34. 34. Title V Application and permit fee, installer signature k...------- 35. 35.Foundation footing min.2 feet above adjusted ground water for new house .....--- 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map\ L-------- Plan ,„---/Plan reviewed by: CV) 6/03/03