HomeMy WebLinkAboutLandscape Plan - 2.15.201920
10
0
—5
G7
0+00
;III.
Sediment 0C,
Control Line
Wildflower Native
Grass Meadow
5 5p' t
LAWN --; I BVW-�— ,3'BEOACHAL LAND UNDER OCEAN (SALT POND)
I
I 30'± COASTAL BANK
TOB BOB
FEMA FLOOD EL. = 9, PIER, RAMP AND FLOAT EXTEND 47'±BEYOND MHW -----�
CONSTRUCTION NOTES:
1. LLLVAIIUNS KLFLN 10 NAVD 88. CONTACT DOWN CAPE ENGINEERING FOR
ADDITIONAL ELEVATION INFORMATION AS NEEDED.
2. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUT SHOWN ON THE PLAN
AND DIRECTLY OVER THE APPLICANT'S PROPERTY.
3. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE
INSTALLATION OF THE PROPOSED WORK. EQUIPMENT AND MATERIALS HANDLING SHALL
BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF
INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DRECTED BY THE YARMOUTH
CONSERVATION AUTHORITIES.
4. THE DOCK INSTALLATION SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS
MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND.
AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE MARSH.
5. A WORK LIMIT SHALL BE STAKED AND MAINTAINED TO INSURE MINIMAL ACTIVITY IN
THE THE EXISTING MARSH WITH MINIMAL ACTIVITY OCCURRING BEYOND THE WORK
LIMIT. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY
DURING TIMES OF HIGH TIDE AND WHEN NOT IN USE. WORKING BARGE TO BE
ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE.
6. PILES SHALL BE DRIVEN BUTT END FIRST TO THE DEPTHS SPECIFIED ON THE PLAN.
IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE
CONTACTED BEFORE PROCEEDING. PILES CAN BE INITIALLY I JETTED TO SET, BUT
THEN SHALL BE MECHANICALLY DRIVEN FROM THE WORKING BARGE. EACH BENT
BEYOND MHW SHALL BE ANCHORED TO THE BOTTOM WITH A HELICAL OR MANTA
STYLE ANCHOR FOR PROTECTION OF ICE UPLIFT.
7. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR
PRE—CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT
CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING E6UIPMENT FROM THE SITE.
8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO
RESEMBLE THE PRE—CONSTRUCTION CONTOURS AND CONDITIONS.
9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED
FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE
START OF ANY WORK.
10. ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEE , UNLESS OTHERWISE
APPROVED BY OWNER OR SHOREFRONT CONSULTING.
4' 2"x6" RAILING CAP
4"x4" POST BOLTED
Qay,,)I,Canoe THROUGH YOKES AND
TYP2"x4" RAILINGS (TYP) JOISTS (TYP)
° 2"x12" STRINGERS
(81 TOTAL, TYP)
RECESSED DECKING OR (4) 4'x10"
W/ 3/4" SPACING
KAYAK STORAGE 3/4" THROUGH—BOLTS
BRACING (2 TYP, -- - _ -_ (TYP)
EACH SIDE) 3"x10" YOKE; (2) TYP.
3"x8" CROSS
BRACING, (TYP)
3/4" THROUGH BOLT WITH
DOCK WASHERS (TYP)
10" GREENHEART PILE (INSTALL
BUTT END DOWN, TYP) OR
° PEARSON FIBERGLASS PILES
° "INSTALL SCREW ANCHOR AT
EACH BENT BEYOND MHW TO
PREVENT ICE UPLIFT
.DOCK SECTION B- B EL E VA TION D E TA I L
2—SCALE
JDCE #18-277
1+ 00
SECTION A -A ELEVATION DETAIL
10—SCALE
20
LL•J
0
—5
SURVEY NOTES:
RECORD OWNER: RICHARD HACSUNDA C/O PAUL BUCKLEY
32 MAYFLOWER TERRACE, SOUTH YARMOUTH, MA 02664
ASSESSORS MAP 110, PARCEL 35
DEED BK. 31074 PG. 199
PLAN BK. 94, PG, 11
PROPERTY LIES WITHIN RESIDENTIAL ZONE R40.
PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD
SURVEY BY DOWN CAPE ENGINEERING IN JULY, 2018 AND
COMPILED FROM PLANS ON RECORD RECORDED IN'THE
BARNSTABLE COUNTY REGISTRY OF DEEDS.
PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 9' NAVD
88) PER FIRM PANEL #583 OF 875, COMMUNITY MAP NUMBER
25001 CO591 J EFFECTIVE DATE JULY 16, 2014 AS SHOWN ON THE
FEMA ON—LINE DATA BASE.
WETLAND RESOURCES SHOWN WERE FIELD IDENTIFIED BY BRAD
HALL
DATUM FOR ALL ELEVATIONS = NAVD 88
MEAN HIGH WATER = 1.9' NAVD 88
MEAN LOW WATER = —0.3 NAVD 88
SOURCE; DIRECT MEASUREMENT WITH HOBO U20L WATER LEVEL LOGGER BY SHOREFRONT CONSULTING
THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS
THEREFORE NOT SUBJET TO MESA REVIEW
2"x6"
CAP
RAILING B
TYP
2 2/12/19 ADD LANDSCAPING DETAILS
PROPOSED 12" DIAM. x 30'
NO. MTE REVISION
DECK
5/8" THROUGH
PROJECT NO.
18-277
scAlE AS SHOWN
2"x6" DECKING W/ 3/4"
LONG GREENHEART PILES; TOP
DATE 10/25/2018
SPACING; OVERLAP 1" (TYP)
DRAWN BY
MCB
°
CHECKED BY
MCB
1PROPOSED 3'08' RAMP
DRAWING NO.
18-277.DWG
OF PILE = 12' NAVD (2 TOTAL)
939 MAIN STREET
YARMOUTHPORT,- MA 02675
(508) 362-4541
SHOREFRONT CONSULTING
PROPOSED 4'x42'
PIER; DECK •PRO •
DENNISPORT, MA. 02639
3/4" THROUGH
i HEIGHT = 7.9'f
AVD88 SED 2'x8' ST RAGE BENCH
1 Or 1 SHEETS
BOLT WITH DOCK
EX. GRADE
WASHERS (TYP)
PROPOSED 10'
'ET.
Y
-----
FEMA FLOOD go
Q '
X 20' FLOAT 1
B
DOCK SECTION
A -A ELEVATION DETAIL
J '
Poposed
Kayak
MHW= 1.9'
R
cks (4 total) i l
Q '
�:
MLW=
—0.3'
01 C)
>I I
'5. 3.3'
m: J:
—3 MLW=
—3.3'
Lj_ :
LLI:
EX. GRADE 7=7�
EX. GRADE
PUT ADDITIONAL FLOTATION
:E
ON THIS END
20' 7 20'
O
N
ui
N
L6
I
I
JDCE #18-277
1+ 00
SECTION A -A ELEVATION DETAIL
10—SCALE
20
LL•J
0
—5
SURVEY NOTES:
RECORD OWNER: RICHARD HACSUNDA C/O PAUL BUCKLEY
32 MAYFLOWER TERRACE, SOUTH YARMOUTH, MA 02664
ASSESSORS MAP 110, PARCEL 35
DEED BK. 31074 PG. 199
PLAN BK. 94, PG, 11
PROPERTY LIES WITHIN RESIDENTIAL ZONE R40.
PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD
SURVEY BY DOWN CAPE ENGINEERING IN JULY, 2018 AND
COMPILED FROM PLANS ON RECORD RECORDED IN'THE
BARNSTABLE COUNTY REGISTRY OF DEEDS.
PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 9' NAVD
88) PER FIRM PANEL #583 OF 875, COMMUNITY MAP NUMBER
25001 CO591 J EFFECTIVE DATE JULY 16, 2014 AS SHOWN ON THE
FEMA ON—LINE DATA BASE.
WETLAND RESOURCES SHOWN WERE FIELD IDENTIFIED BY BRAD
HALL
DATUM FOR ALL ELEVATIONS = NAVD 88
MEAN HIGH WATER = 1.9' NAVD 88
MEAN LOW WATER = —0.3 NAVD 88
SOURCE; DIRECT MEASUREMENT WITH HOBO U20L WATER LEVEL LOGGER BY SHOREFRONT CONSULTING
THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS
THEREFORE NOT SUBJET TO MESA REVIEW
2"x6"
CAP
RAILING B
TYP
2 2/12/19 ADD LANDSCAPING DETAILS
2"x4" RAILING
NO. MTE REVISION
TYP
5/8" THROUGH
PROJECT NO.
18-277
scAlE AS SHOWN
2"x6" DECKING W/ 3/4"
BOLT `TYP
DATE 10/25/2018
SPACING; OVERLAP 1" (TYP)
DRAWN BY
MCB
°
CHECKED BY
MCB
32 MAYFLOWER TERRACE SOUTH YARMOUTH
DRAWING NO.
18-277.DWG
2"x12" STRINGERS
3
939 MAIN STREET
YARMOUTHPORT,- MA 02675
(508) 362-4541
SHOREFRONT CONSULTING
(TYP)
3"x10" YOKE;
DENNISPORT, MA. 02639
3/4" THROUGH
(2) TYP.
_
1 Or 1 SHEETS
BOLT WITH DOCK
WASHERS (TYP)
,„_-3"x8" CROSS
BRACING, (TYP)
-----
10" FIBERGLASS
PILES (TYP)
B
DOCK SECTION
A -A ELEVATION DETAIL
PROPOSED 4'x42' PIER
PROPOSED 2'x8' STORAGE BENCH
2—SCALE
0
N
PROPOSED 3'x18' RAMP o
0
w
N
0
CL
or a
DOCK PLAN VIEW
10—SCALE
Scale: 1"= 20'
0 10 20 30 40 50 FEET
LOCUS MAP
SCALE 1"=2000'±
ASSESSORS MAP 110 PARCEL 35
DATE DANIEL A. OJALA, P.E., P.L.S.
�;,,.nv� o�.►ty
1 11/27/18 MHW/MLW ON PLAN VIEW
2 2/12/19 ADD LANDSCAPING DETAILS
NO. MTE REVISION
gy
SHEET VIE
PLAN SHOWING
PROJECT NO.
18-277
scAlE AS SHOWN
PROPOSED DOCK
DATE 10/25/2018
PROJECT
DRAWN BY
MCB
PAUL B U C K L E Y
CHECKED BY
MCB
32 MAYFLOWER TERRACE SOUTH YARMOUTH
DRAWING NO.
18-277.DWG
DOWN CAPE ENGINEERING, INC.
939 MAIN STREET
YARMOUTHPORT,- MA 02675
(508) 362-4541
SHOREFRONT CONSULTING
290 CENTER STREET
DENNISPORT, MA. 02639
(508) 280-8046
WWW.SHOREFRONTCONSULTING.COM
1 Or 1 SHEETS