HomeMy WebLinkAboutReview Checklist . TOWN OF YARMOUTH
X76 SEWAGE PLAN REVIEW CHECKLIST
Location: AM 96 LOT / Date of Subdivision Approval
Street ,49,40., ...,:i- ar Zone of Contribution: In Out
Village 5. q , , Commercial Residential
Owner: /J"( .l4j l'
.)- Installer A ''eeir
-3 > -' c-
Builder: Engineer % t r_-/24.- --eS.-17/
N/A YES NO
1. Required number of copies received. L/
2. Date of soils exam and percolation test not older than 2 years. t/
3. 4 feet of naturally occurring pervious material, above water tablelnew construction) r /
4. Foundation 2 feet above high point of fronting road for new construction. ,...------
5. Water availability letter from Water Department for new construction.
6. Benchmark indicated and shown- NGVD if near wetlands. ,-.,/'
7. Building sewer does notexit center of house.
8. Septic tank a minimum of 10 feet from house and deck.
9. Leaching a minimum of 20 feet from house and 10 feet from deck. j'
10. Leaching a minimum of 100 feet from wetlands.
11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. (. /"
12. System meets all other setback requirements.
13. Uses adjustment for maximum WO groundwater. 1------ .
14. Leaching 4 -5 feet above adjusted water table or bottom of test pit.
15. System not in top or subsoil or 5 foot removal.
16. Proposed contours are suitable. i -------
17. System meets slope requirements - min. 1/8". 1/4" preferred: k...----
18. System meets breakout requirements- peastone elevation carried out 15 feet minimum.
19. Specified tee sizes are proper-gas baffle on outlet tee.
20. Sewage flow under 10,900 gndfor parcel ,,/
21. No garbage disposal. l/
22. System adequately sized for its intended use. ,�
23. Minimum 6" stone or mechanically compacted below the tank and d-box.
24. Manhole covers within 6" of grade - septic tank and g}tmp chamber. ,�--
25. Electrical permit for pump chamber. ,.---
26. Pump system - 2" line, weep hole. check valve. sanitary in d-box. alarm on separate circuit. 1
27. Septic tank and pump chamber to be Factory waterproofed. ,-/
28. Vent provided if leaching below 3 feet or under driveway or parking ,/
29. Engineer to inspect and certify : a. clay removal ,�
b. wall construction schedule '✓
c: commercial system /
30. Engineer and Land Surveyor stamp and signature,
31. H2O loading when system subject to vehicular traffic- ✓
32. Title V application and fee signed by a licensed installer.
33. Foundation tooting.2 feet above adjusted water table. L
34. Lot subdivided prior to July 3L_ 1986 - Nitrate Loading, --/
35. Subdivided prior co April 7. 1989 - Phosphorus Zone 300'. c_
Planreviewed by: C&)___,4 ,