Loading...
HomeMy WebLinkAboutReview Checklist ..,, - 7- / f 706(.._ - TOWN OF YARMOUTH ,�,/ 6 "Ael SEWAGE PLAN REVIEW CHECKLIST �i' r Location: A.M. 7 Lot 1% Zone of Contribution: In✓Out Acreage�� �if',�>� Commercial: Residential: t/',,. t 0�` Street: g S TV(N/,�/(/l p... ""/ / , Village: i, <,4f,V Floor Plan: I #Bedrooms: Owner: y12f1/4f / 10,!/e6 Installer: Sr Address: Phone: q77 05-3 Phone: Builder: Engineer: kOked. 41(003.0/ Address: Phone: ' i67-/‘/7 Phone: i P5/y. 1 N/A YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years t.-------- 3. 4-5 .�-----3. 4-5 ft of naturally occurring pervious material, above water table l--,--'-. 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5.Water line 10 ft from septic components Var.: (,,-.''' 6.Benchmark indicated and shown-NGVD if near wetlands C.------- 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: (......---- 9.Leaching minimum 100 ft from wetlands Var.: .--/ _ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: (..------- 11. Tank/leaching minimum 10 ft from property line Var.: (.....--.--- 12. System meets all other setback requirements Var.: ��- 13.Uses adjustment for maximum high groundwater Var.: k./ 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: (,v--'''. 15. System not in top or subsoil(A,B horizons) or 5' removal t s 16.Proposed contours are suitable C...------- 17. System meets slope requirements-min. 1/8", 'A"preferred L.------- 18. System meets breakout requirements PVC liner: Wall: L...---- 19. Specified tee sizes are proper, gas baffle on outlet tee L---' 20. Sewage is under 10,000 gpd for parcel t_� 21.No garbage disposal l.----• 22. System adequately sized for its intended use 1/4------- 23.Minimum 6"stone or compacted below tank and dbox \----- 24. .r24.Manhole covers within 6"of grade,pump chamber cover to grade L1 25.Inspection port on plastic chambers/leach field ...._,. 26.Electrical permit for pump chamber/Separate meter for duplexes ......---- 27.Pump system-2" line,weep hole,check valve, tee in dbox, pump size ------- 28. Septic tank/pump chamber to be factory waterproofed -------- 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater ,.------4 34.Title V Application and permit fee, installer signature - / 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: - max. flow:Z?----d gpd -------- 37. -s37.Check area lots for groundwater/Label groundwater in Assessor's Map L.S Plan reviewed by: eiO3iO3