Loading...
HomeMy WebLinkAboutReview Checklist 0- Z �O f TOWN OF YARMOUTH / .`�C ` SEWAGE PLAN REVIEW CHECKLIST /6(; , _ " Location: A.M 9 0 Lot 7 7 Zone of Contribution: In c/Uut_ Acreage.14Q-1) 5 i - / Commercial: Residential: L__,.....-- Street: /Street: • 7 -Ai. a 41 10 ,, Village: !/ riy Floor Plan: / / #Bedrooms: Owner P -" Installer: 7 t, /' ,y 1' C W Address: Phone: Phone: Builder: Engineer: ,ç- e.. 4/ , " Address: Phone: •w; - ` r 'jam / Phone: �� ?i .___. 4/ N/A � NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years .....----- 3.4-5 .,.----3.4-5 ft of naturally occurring pervious material, above water table , 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: �.-- 6.Benchmark indicated and shown-NGVD if near wetlands (...------ 7. Septic tank minimum 10 ft from foundation, deck Var.: �- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L... 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: / ‘.....--- 12. ..- -12. System meets all other setback requirements Var.: `,...� 13.Uses adjustment for maximum high groundwater Var.: t....___-- 14. `-14.Leaching set 4-5 ft above adj.water or bottom o st hole Var.: 15. System not in top or subsoil(A,B horizons) 5'remo al; I 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", ' "preferred tom- 18. System meets breakout requirements PVC liner: Wall: :r--- 19. Specified tee sizes are proper, gas baffle on outlet tee --= 20. Sewage is under 10,000 gpd for parcel __ 21.No garbage disposal L.._ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox L<„`=- r 24.Manhole covers within 6"of grade,pump chamber cover to grade t_._-- 25.Inspection port on plastic chambers/leach field ‘.--- 26. 26.Electrical permit for pump chamber/Separate meter for duplexes �___._--- 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed ._---- . 29.Vent provided if leaching below 3 feet, under driveway/parking �- 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: -s' 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ( ) 33.H-20 loading is subject to vehicular traffic, groundwater ? 34.Title V Application and permit fee, installer signature C 35.Foundation footing min. 2 feet above adjusted ground water for new house 1/4.____--- 36.Deed Restriction required max. #bedrooms: max. flow: gpd ----- 37. --37.Check area lots for groundwater/Label groundwater in Assessor's Map - Plan reviewed by: 6/03/03