HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot � Zone of Contribution: In Out � Acreage
•
/if4,Xer Commercial: Residential:
Street:
Village: Floor Plan: ✓ #Bedrooms
Owner: 64' Installer: 6*(4
Address: Phone:
Phone:
Builder: Engineer: &I.if
Address: Phone: SZ)--g
Phone: '1 ' -e
71
N/A YES NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands c -
7. Septic tank minimum 10 ft from foundation, deck Var.: ---
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: c ---
9.Leaching minimum 100 ft from wetlands Var.: �---"
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: --
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ,frar,rkt
J q//ttatit' ./
13.Uses adjustment for maximum high groundwater Var.: i_ r
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", ' "preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use
• 23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade, pump chamber cover to grade
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater _--- '
34.Title V Application and pe,uiit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: ) 6/03/03