Loading...
HomeMy WebLinkAboutReview Checklist YY TOWN OF YARMOUTH / SEWAGE PLAN REVIEW CHECKLIST ., 1 � 'i. � Location: A.M. /9C---- Lot ‘ Zone of Contribution: hr.----Ort Acreag�!© 7;619��/`-'" Commercial: Residential: (..f� Street: /////ii Village: �i ) Floor Plan: #Bedrooms: Owner: ja*/7C/074// Installer: C . Address: Phone: c3 './4-77rQ 3 Phone: l a 1 4i/ (7 t1#r�(2/ Builder: Engineer: t�s74�+�f'/ % ! ,� Address: Phone: 5a 9- , Phone: -- l N/A YES NO 1.Required#of copies received .---"" 2.Date of soils exam and percolation test not older than 2 years ,.s'' 3.4-5 ft of naturally occurring pervious material, above water table i__ --'- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: . _,,,r- "' 5.Water line 10 ft from septic components Var.: ✓'1 6.Benchmark indicated and shown-NGVD if near wetlands �..--"" 7. Septic tank minimum 10 ft from foundation, deck Var.: �- --' 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: i"' _ 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,----- 11.Tank/leaching minimum 10 ft from property line Var.: (c L/ - ���' 12.System meets all other setback requirements Var.: .- 13.Uses adjustment for maximum high groundwater Var.: k._---/ 14.Leaching set 4-5 ft above adj. water or bottom est ho Var.: L------- 15. --/15. System not in top or subsoil(A,B horizons)o 5' remov �,,. 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '.4"preferred _ �--- 18. System meets breakout requirements PVC liner: Wall: .__.._- 19. Specified tee sizes are proper, gas baffle on outlet tee (....------ 20. Sewage is under 10,000 gpd for parcel <y! ' � 21.No garbage disposal �-� _ 22. System adequately sized for its intended use ' 23.Minimum 6"stone or compacted below tank and dbox ..,-'7 24.Manhole covers within 6"of grade, pump chamber cover to grade ,,..-' 25.Inspection port on plastic chambers/leach field (....----- 26.Electrical permit for pump chamber/Separate meter for duplexes ---' 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size -'yJ 28. Septic tank/pump chamber to be factory waterproofed --- 29. '29.Vent provided if leaching below 3 feet,under driveway/parking - _ 30.Buoyancy calculations for tank/pump chamber --%" 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 5 9f ' 33. H-20 loading is subject to vehicular traffic, groundwater ..--"'" 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: 7 max. flow:7r).-() gpd -~''--'? 37. Check area lots for groundwater/Label groundwater in Assessor's Ma Plan reviewed by: (z 6/03/03 1