HomeMy WebLinkAboutReview Checklist /O r -14P TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
c.-----
Location: A.M. Lot ( Zone of Contribution: In Out_ Acreage
,�j Commercial: Residential: `--
Street: /i / A� rr/Ir
Village: l Floor Plan: #Bedrooms:
Owner: ,.._ i i / / /L�/ Installer: P.
L
ld Ai4d176- -4e"%4
Address: Phone:
Phone:
Builder: Engineer: LGG'
Address: /.- Phone: 6-'''.)- -,
Phone: 11 :'C'ovfric 1a /'
/A 0
1.Required# of copies received
2.Date of soils exam and percolation test not older than 2 years C�/
3.4-5 ft of naturally occurring pervious material, above water table L
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: '� _-----
5.
-5.Water line 10 ft from septic components Var.: ;:.-------
6.
:.--i6.Benchmark indicated and shown-NGVD if near wetlands L.-------f-
7. Septic tank minimum 10 ft from foundation, deck Var.: , ._---,
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L.---"-
9.Leaching minimum 100 ft from wetlands Var.: �.-
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: "'-'
11.Tank/leaching minimum 10 ft from property line Var.: �/
_ 12. System meets all other setback requirements Var.: l_.•-
13.Uses adjustment for maximum high groundwater Var.: �,;
14.Leaching set 4-5 ft above adj.water or bottom o est hole Var.: �' i.-------"--
'-----)
_� (- '
15. System not in top or subsoil(A,B horizons)ori remov ' /
16.Proposed contours are suitable . --'
17. System meets slope requirements-min. 1/8", 'A"preferred (.-----
18.
-'18. System meets breakout requirements PVC liner: Wall: L..---' "
19. Specified tee sizes are proper, gas baffle on outlet tee --
20. Sewage is under 10,000 gpd for parcel ...-----
21.No garbage disposal "1/4.._---
22. System adequately sized for its intended use ‘.....----
23.Minimum 6"stone or compacted below tank and dbox -----/
24.Manhole covers within 6"of grade,pump chamber cover to grade (..----------
25.
.-,--�25.Inspection port on plastic chambers/leach field '. ---'' _
26.Electrical permit for pump chamber/Separate meter for duplexes •L---•'
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed • lam--
29.Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber '‘..------
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature \------'
33.H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house w ..--
36.Deed Restriction required max. #bedrooms2-max. flow: :2-t',r gpd ‘,..y-.---'
37.Check area lots for groundwater/Label groundwater in Assessor's a.. '\„__.,----
-
Plan reviewed by: (/' 6/03/03