Loading...
HomeMy WebLinkAboutReview Checklist /O r -14P TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST c.----- Location: A.M. Lot ( Zone of Contribution: In Out_ Acreage ,�j Commercial: Residential: `-- Street: /i / A� rr/Ir Village: l Floor Plan: #Bedrooms: Owner: ,.._ i i / / /L�/ Installer: P. L ld Ai4d176- -4e"%4 Address: Phone: Phone: Builder: Engineer: LGG' Address: /.- Phone: 6-'''.)- -, Phone: 11 :'C'ovfric 1a /' /A 0 1.Required# of copies received 2.Date of soils exam and percolation test not older than 2 years C�/ 3.4-5 ft of naturally occurring pervious material, above water table L 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: '� _----- 5. -5.Water line 10 ft from septic components Var.: ;:.------- 6. :.--i6.Benchmark indicated and shown-NGVD if near wetlands L.-------f- 7. Septic tank minimum 10 ft from foundation, deck Var.: , ._---, 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L.---"- 9.Leaching minimum 100 ft from wetlands Var.: �.- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: "'-' 11.Tank/leaching minimum 10 ft from property line Var.: �/ _ 12. System meets all other setback requirements Var.: l_.•- 13.Uses adjustment for maximum high groundwater Var.: �,; 14.Leaching set 4-5 ft above adj.water or bottom o est hole Var.: �' i.-------"-- '-----) _� (- ' 15. System not in top or subsoil(A,B horizons)ori remov ' / 16.Proposed contours are suitable . --' 17. System meets slope requirements-min. 1/8", 'A"preferred (.----- 18. -'18. System meets breakout requirements PVC liner: Wall: L..---' " 19. Specified tee sizes are proper, gas baffle on outlet tee -- 20. Sewage is under 10,000 gpd for parcel ...----- 21.No garbage disposal "1/4.._--- 22. System adequately sized for its intended use ‘.....---- 23.Minimum 6"stone or compacted below tank and dbox -----/ 24.Manhole covers within 6"of grade,pump chamber cover to grade (..---------- 25. .-,--�25.Inspection port on plastic chambers/leach field '. ---'' _ 26.Electrical permit for pump chamber/Separate meter for duplexes •L---•' 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed • lam-- 29.Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber '‘..------ 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature \------' 33.H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house w ..-- 36.Deed Restriction required max. #bedrooms2-max. flow: :2-t',r gpd ‘,..y-.---' 37.Check area lots for groundwater/Label groundwater in Assessor's a.. '\„__.,---- - Plan reviewed by: (/' 6/03/03