Loading...
HomeMy WebLinkAbout2018 Oct 1 - Email to Engineer vonHone, Amy From: vonHone,Amy Sent: Monday, October 1, 2018 2:27 PM To: 'slopez@downcape.com' Cc: Craig J. Ferrari - DCE Subject: RE: 10 Nauset Road Attachments: TITLE V DEED RESTRICTION APPLICATION_4_.pdf Hi Craig and Sue- I have reviewed the plan and everything is fine. One suggestion—replace the quick disconnect in the pump chamber with a gate or ball valve which will allow the volume of water being pumped to the dbox to be turned down if it is overflowing the dbox. The gate or ball valve will be acting as the quick disconnect. Because of the groundwater variance,the property will need a 2 Bedroom Deed Restriction. Let me know if you have any questions. Thanks,Amy Amy L.von Hone, R.S.,C.H.O. Assistant Health Director Yarmouth Health Department From:slopez@downcape.com [mailto:slopez@downcape.com] Sent:Thursday,September 27, 2018 8:45 AM To:vonHone,Amy<AVonHone@yarmouth.ma.us> Subject: 10 Nauset Road Good morning Amy,attached please find a pdf of a Title 5 Site Plan for 10 Nauset Road. Could you please review for a requested groundwater separation reduction and advise. Thank you Sue Lopez Down Cape Engineering, Inc. 939 Main Street Suite C Yarmouth Port, MA 02675 508-362-4541 ext. 100 slooez@downcape.com 1