Loading...
HomeMy WebLinkAboutReview Checklist --14;------fTOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST / /,,, . ...1C 44402)y2....7 Location: A.M. -7,C Lot / 7 6 Zone of Contribution: In ut_ Acreage ®, S 00.0 Commercial: Residential: (-- • Street: "1--‘ 10)0t 47 Village: Koer Floor Plan: (./ #Bedrooms: 7-- Owner: 6E7( Installer: 6 6 / G Phone: •- a:r Address: GI�i� �7T Phone: Builder: Engineer: Address: Phone: 'aj 7--/i/7 Phone: N/A YES/ NO 1.Required# of copies received 1 2. Date of soils exam and percolation test not older than 2 years L---- 3. i3. 4-5 ft of naturally occurring pervious material, above water table t....--- 4. .r4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c.i--- 5. Water line 10 ft from septic components Var.: L------- 6.Benchmark indicated and shown-NGVD if near wetlands L„/ 7. Septic tank minimum 10 ft from foundation, deck Var.: %---- 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V/ 9.Leaching minimum 100 ft from wetlands Var.: ..._.----- 10. -f10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: -- ---- 11. Tank/leaching minimum 10 ft from property line Var.: t------- 12. /12. System meets all other setback requirements Var.: _ ....---- 13. Uses adjustment for maximum high groundwater Var.: \----- 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal ‘..._.-- 16.Proposed contours are suitable � --• 17. System meets slope requirements-min. 1/8", '/4"preferred �.i' 18. System meets breakout requirements PVC liner: Wall: L__. 19. Specified tee sizes are proper, gas baffle on outlet tee \.---- 20. Sewage is under 10,000 gpd for parcel - - 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6" stone or compacted below tank and dbox .--- 24.Manhole covers within 6"of grade,pump chamber cover to grade L.-- 25.Inspection port on plastic chambers/leach field L.---- 26. 126.Electrical permit for pump chamber/Separate meter for duplexes - 27.Pump system-2" line,weep hole,check valve, tee in dbox,pump size --- 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature (------ 33.H-20 loading is subject to vehicular traffic, groundwater L...--- 34. f34.Title V Application and permit fee, installer signature - �.--- 35.Foundation footing min. 2 feet above adjusted ground water for new house ...----- 36. -✓36.Deed Restriction required max. #bedrooms: max. flow: gpd _ 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03