Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH • SEWAGE PLAN REVIEW CHECKLIST Location: A.M. /Z 2- Lot /)___9C. Zone of Contribution: In_ Out Acreage ' - Commercial: ---- Residential:C Street: 44/ ‘79 d' ( = 3 .5 .:.--- Village: Village: Floor Plan: #Bedrooms: Z Owner: �.1,J1.(.(_ (4 1 Installer: ����C.�'� / f Address: Phone: cjfC Phone: Builder: Engineer: bi'Lx..k �l js Address: Phone: Si" � Phone: 9 ' C , f, N/ YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table �--' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: , 9.Leaching minimum 100 ft from wetlands Var.: <-- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: _ ^ 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5'removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred L--� 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel /21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade, pump chamber cover to grade t 25.Inspection port on plastic chambers/leach field -f 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed L� 29.Vent provided if leaching below 3 feet,under driveway/parking --r 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater , 34. Title V Application and permit fee, installer sig tore 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: L 6/03/03