Loading...
HomeMy WebLinkAboutReview Checklist i TOWN OF YARMOUTH k SEWAGE PLAN REVIEW CHECKLIST 31 T � Location: A.M. Lot Zone of Contribution: In Out. Acreage '` Commercial: Residen 'al: iG /,Street: .2- 7'.1 �.r H� /&/I/ 6 I' 4iSYt_ 2� -/0 L' 17,--7' r Village: Floor Plan: , �#Bedrooms: Owner: hitted F A A _4:e Installer: $e ,1'i 66 li Address: 51.4cie_fie, Phone: 6/7 - 772- -- 1-0.,--400 Phone: (40 fiffriitrV2/ 6/7= $*I,' Builder: Engineer: 42i ,-/ /6/,,4.,k,-4, . Address: Phone: .1SI"- �9--3/4__ Phone: 7` -/6 //L µ2 t:�C: 1 A N/A YES NO 1.Required#of copies received ls"/ 2.Date of soils exam and percolation test not older than 2 years 1!- 3.4-5 ft of naturally occurring pervious material,above water table L/ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: i...---- 5. Water line 10 ft from septic components Var.: E---'-- 6. Benchmark indicated and shown-NGVD if near wetlands l.._.--- ' 7. Septic tank minimum 10 ft from foundation, deck Var.: c__..------ 8. __..--..i8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: : t -------- •,..-- 9. ----- 9.Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: `.. -- 11. Tank/leaching minimum 10 ft from property line Var.: --�� 12. System meets all other setback requirements Var.: L...,"" 13.Uses adjustment for maximum high groundwater Var.: (.------ 14. 14. Leaching set 4-5 ft above adj.water or bottom test hole'Var.: 1�' 15. System not in top or subsoil(A,B horizons)o ' remova r 16.Proposed contours are suitablLV e 17. System meets slope requirements-min. 1/8", 1/4"preferred 18. System meets breakout requirements PVC liner: Wall: - - 19. Specified tee sizes are proper, gas baffle on outlet tee \-7 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use \-- '" 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade �• �''� 25. Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed -_-'' 29. Vent provided if leaching below 3 feet, under driveway/parking ✓-- 30. Buoyancy calculations for tank/pump chamber ---- 31.Engineer to inspect and certify soils: ./ wall: commercial: ✓� 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature .�/ 33.H-20 loading is subject to vehicular traffic, groundwater ',..---7',,...... 34.Title V Application and permit fee, installer signature �� 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03