Loading...
HomeMy WebLinkAboutReview Checklist `l 1' TOWN OF YARMOUTH 4 c-'57.- -"-ti - • SEWAGE PLAN REVIEW CHECKLIST - ' Location: A.M. Lot Z'� Zone of Contribution: In ut_ Acreage /- 77 ( v �� _ _ Commercial: Residential: �� L Street: Village: Z ,Q,r Floor Plan: `--"*** #Bedrooms: Owner: I e,-- `411. -� iInstaller: he S Address: Phone: sig-¢' -dP/J„-- Phone: Builder: /7.-- Engineer: �{ -e - !' a%,y- Address: Phone: r- " �-- , S-14- Phone: ( _ 4,64/4-7;-7 zi. N/A YES NO 1.Required#of copies received L....------- 2. j2. Date of soils exam and percolation test not older than 2 years (,/' j 3.4-5 ft of naturally occurring pervious material, above water table c..._--- , 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: L.-/ 1 5. Water line 10 ft from septic components Var.: Li-' 6.Benchmark indicated and shown-NGVD if near wetlands ( �/ 7. Septic tank minimum 10 ft from foundation, deck Var.: �/ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: y f 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: -- 11. Tank/leaching minimum 10 ft from property line Var.: .L.----- 12. ,,..--12. System meets all other setback requirements Var.: ' 13.Uses adjustment for maximum high groundwater Var.: ,- • 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ✓'` 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are p suitable i----- 17. System meets slope requirements-min. 1/8", I/4"preferred ‘......---- 18. System meets breakout requirements PVC liner: Wall: L.-,.,.-- 19. Specified tee sizes are proper, gas baffle on outlet tee i.. 20. Sewage is under 10,000 gpd for parcel v - 21.No garbage disposal 22. System adequately sized for its intended use L...----- 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade, pump chamber cover to grade L-/ 25. Inspection port on plastic chambers/leach field ,,---- 26.Electrical permit for pump chamber/Separate meter for duplexes ��--- 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber _ ----• 31.Engineer to inspect and certify soils: • wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater �- 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 'a 6/03/03