Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Engineered Plan - 2018
ASSESSORS MAN PARGELs '0v5- FLOOD ZONE:,,- . ZONE::_ -- REFERENCE: `-I -7 a /vc ZO 46 IC)C`�Ito 10� 0 i, i �I I i .i I- i l . • it 1 { I ' I j M� '� • I 1 I I ik -ioLE ���0 51 ;.� ; 1) The inslallallon shall com1:,� with Title V 1111,1 'Town of > w Iloilyd of SOIL''EVALUATOR; �;'{ G ileallh Iteguiallons, WI 7NES3; 2) .The insialler'sllall verify the location of nfililies, sewer Inverts and septic DATE i t components prior to Installation and setting base elevations. '`, PERCOLAT ofd ; RA , E: , � lin +' . 3) All gravity septic piping to be 4 inch Sch ,10 PVC at 1/8" per foot. Th6 first �: Ivo feet out of the 4-b ox to (lie leaching shall be level. rNy .•• "°��� ' '. w ` ' 4) This plan is not to be utilized for property line deienuination nor nnY other I • ` TI1-2 I purpose other than the proposed system Installation. i S) ` All septic components must meet Title V specifications. i 10 1 6) Parkin shall not be constructed over ((10 septic coil onents. g pp owkf 7) ;Che property Is bounded by property corners and property lines. h 2/ 8) The property owner shall reVleW design considerations to approve of total ! design flow and nunibei• of bedrooms to be'considered for design. Receipt t l of payment for the plan And installation based on file pian shall be deemed I i, approval of the design flow by the owner: 9) The existing leaching or cesspools shall be puniped and tilled Willi material her Title V abandonment procedures. Those within the proposed SAS shall 5 1 t ` be removed aloe with contaminated soil and replaced with c e G�� g � ( I an sand per Title V specs. . 10) System components lobe 10 feet front water line. Sewer lines cr'ossing.ihe j Water line. shall be sleeved with 4 inch SCI1'40 PVC Willi ends grouted 1l' applicable. The proposed SAS is being Installed below the wafer service line: 11te line Is to be sleeved as arorementioned and rnabilained in place. SEPT IC SYSTEM' DES I GN 11) if a garbage grinder ei ists it Is to be removed and is the responsibility of the owner to ensure such. ; FLOW' ESTI MATE I `� 2� I 12) TI1e installer Is to take caution ftt excavation around the gas line if snch ` exists. BEDROOMS : AT //0 GAL/DAY/BEDROOM-33�00AUDAY t 13) The installer shall verify the location, quantity and elevation of the sewer i lines exiting file dwelling prior to the installation. 14)This plan is representative only that a syslem can fit on a properly meeting SEPTI TANK i Title V requirements. AL/DAY: x 2: DAYS y UsE% �Ga1.LON ;SEPTIC TA K 0W ABSORPTIlV SYSTEM DO 40 S i DE . AREA' ' Z�J 't' �Z� X X ©i . - 1 r -I �,� UAvin BOTTOM AREA= i 0, h1A5011 n ! t O No 066 Tf:P i 'tNl>AFill' �' SEPTIC SYSTEM "ECT iON U 9.; o 611 Q io "x ,QAL Al SEPT 1 C TANK r , v— • .. �I t2 j Yhmont'^ &enIth D-_ ortment S AND..SEWAGE .ITE AN PLAN Syme Bate LOCAT I ON t�j�2 I)ATE PREPARED FOR: Q'%VIV44A,, 60q 1P s utc 'f 201 G r HEALTH r.EPT SCALE: HEALTH AMIT DAV i V U f W 5 ONliv MATE t DRC ENV I RONMEN i'AL. DESIGNS i i i �I • I 1 I j i �I f