Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST e, `" x Location: A.M. � Lot ' 7 Zone of Contribution: In Out age ` Commercial: Residential: Street: ..,..244/, & / g Villa e: --- G�^� Floor Plan: t/ #Bedrooms: Owner: Al/ f,611746 Installer: ,/� y r Address: Phone: Phone: Builder: Engineer: ,, , - Address: Phone: % `0'-�6/40Iiip, Phone: -7; /066e -- e5<eilif-0) N/A YES NO _ 1.Required# of copies received l-..--' 2. Date of soils exam and percolation test not older than 2 years L---- 3. 4-5 ft of naturally occurring pervious material, above water table l;,`s _ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1/4----- 5. s5. Water line 10 ft from septic components Var.: L__.---. 6. Benchmark indicated and shown-NGVD if near wetlands L...r 7. Septic tank minimum 10 ft from foundation, deck Var.: c..�---' 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: c --- L------4 9.Leaching minimum 100 ft from wetlands Var.: \.------ 10. /10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: t 11. Tank/leaching minimum 10 ft from property line Var.: t_....------ 12. System meets all other setback requirements Var.: L.----. 13.Uses adjustment for maximum high groundwater Var.: %........--- 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L..---- 15. System not in top or subsoil(A,B horizons)or 5' removal `--- 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred C.....----- 18. System meets breakout requirements PVC liner: Wall: l..__.-- 19. Specified tee sizes are proper, gas baffle on outlet tee L� 20. Sewage is under 10,000 gpd for parcel L----• 21.No garbage disposal (.------ 22. System adequately sized for its intended use `,..---• 23.Minimum 6"stone or compacted below tank and dbox C....---- 24.Manhole covers within 6"of grade, pump chamber cover to grade L----*" 25.Inspection port on plastic chambers/leach field (..__---- 26. _i26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ,i-- 28. Septic tank/pump chamber to be factory waterproofed ...----- 29.Vent provided if leaching below 3 feet,under driveway/parking ...--.-- 30.Buoyancy calculations for tank/pump chamber `�.. 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater L.---- 34.Title V Application and permit fee, installer signature - _ 35.Foundation footing min. 2 feet above adjusted ground water for new house `_ 36.Deed Restriction required max. #bedrooms: max. flow: gpd - r 37. Check area lots for groundwater/Label groundwater in Assessor's Map - Plan reviewed by: Ca> 6/03/03