Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 96 Lot C Zone of Contribution: In Out '----A-Creage Commercial: Residential: Street: i /i 7 . . 4:- - Village: :M.MrarillIlWff Floor Plan: ✓ #Bedrooms: t Owner: G /t/-` / Installer: --� Address: Phone: 10,,A7tiel Phone: Builder: Engineer: G�� 7Phone: %761,--e./A- l c ef- Address: v Phone: A� ' 7, ✓ ' N/A YES /NO 1.Required# of copies received .. 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table t..------ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: L_/ 5. Water line 10 ft from septic components Var.: l/-- 6.Benchmark indicated and shown-NGVD if near wetlands (...--- 7. :/7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t./ - 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: _....----- 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: �'. 13. Uses adjustment for maximum high groundwater Var.: (_----- 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L .---- 15. System not in top or subsoil(A,B horizons)or 5' removal k..----- 16.Proposed contours are suitable .-✓ 17. System meets slope requirements-min. 1/8", 1/4"preferred �� • 18. System meets breakout requirements PVC liner: Wall: (.......--- 19. Specified tee sizes are proper, gas baffle on outlet tee L----- 20. Sewage is under 10,000 gpd for parcel L...---' 21.No garbage disposal 22. System adequately sized for its intended use �...----- 23.Minimum 6" stone or compacted below tank and dbox t.----- 24.Manhole covers within 6" of grade,pump chamber cover to grade t------ 25.Inspection port on plastic chambers/leach field 4...------ 26.Electrical permit for pump chamber/Separate meter for duplexes `.� 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed `----• 29.Vent provided if leaching below 3 feet,under driveway/parking �----- • 30.Buoyancy calculations for tank/pump chamber c-.-- 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ...---- 33. H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature 0 35.Foundation footing min. 2 feet above adjusted ground water for new house k--/-- 36.Deed Restriction required max. #bedrooms: max. flow: gpd L__' 37.Check area lots for groundwater/Label groundwater in Assessor's Map `� Plan reviewed by: 6/03/03