Loading...
HomeMy WebLinkAboutReview Checklist ,� r I TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 4L Lot 9 2- Zone of Contribution: In Out ge �� k•.1-,/"( Commercial: Residential:L----r Street: Village: -k-ti Oji. Floor Plan: (./ #Bedrooms: 3 Owner: 7" c q iyc'>7 Installer: i7 1 Address: Phone: 47 p-- - '- C f 3 Phone: Builder: ��.111,\ Engineer: lJ.A ' r 2 Address: Phone: 9� " . Phone: 4-DP r'>-2_ -/ -3C2- 461,f/ 7G45t =. --�` /l 1 /1, f/f SKr" G e ', N/A YES NO 1.Required#of copies received (...m.----_-7- 2. �_�� 2.Date of soils exam and percolation test not older than 2 years L.. _ 3.4-5 ft of naturally occurring pervious mitei-ial, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: L----- 5. Water line 10 ft from septic components Var.: (`.._. 6. Benchmark indicated and shown-NGVD if near wetlands s..._.-.. 7. Septic tank minimum 10 ft from foundation, deck Var.: �,s 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t ..--� 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ------ 11. ''11.Tank/leaching minimum 10 ft from property line Var.: �_- 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: k....____-- 14. _,,.14.Leaching set 4-5 ft above adj. water or bottom 9f-test hole Var.: `.___r 15. System not in top or subsoil(A,B horizons) o(5'5' remov �% 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred \-_____- 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee t..--- 20. Sewage is under 10,000 gpd for parcel (_ 21.No garbage disposal L_____.-- 22. System adequately sized for its intended use %,-J ' 23.Minimum 6"stone or compacted below tank and dbox �.__.__- 24.Manhole covers within 6"of grade,pump chamber cover to grade k....._---- 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes -- 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ,--- ' 28. Septic tank/pump chamber to be factory waterproofed . 29.Vent provided if leaching below 3 feet, under driveway/parking (L.G'r .__. 30. Buoyancy calculations for tank/pump chamber y/ 31. Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater _ 34. Title V Application and permit fee, installer sigrjturec7 35.Foundation footingmin. 2 feet above adjustedground water for new house �.,. 36.Deed Restriction required max. #bedrooms: max. flow: gpd `------- 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: (6 .2'i i 6/03/03 J